Difference between revisions of "BLTWG Meeting 01/07/2013"
From GlueXWiki
(→Organization) |
(→Agenda) |
||
Line 11: | Line 11: | ||
# Communication with Yang regarding TOSCA maps - ''Richard'' | # Communication with Yang regarding TOSCA maps - ''Richard'' | ||
# [http://faculty.cua.edu/sober/HallD/Tosca_fringe_field_calculations.html Working with the existing tagger magnet map] - ''Dan'' | # [http://faculty.cua.edu/sober/HallD/Tosca_fringe_field_calculations.html Working with the existing tagger magnet map] - ''Dan'' | ||
+ | #* [http://faculty.cua.edu/sober/HallD/magnet+fp.pdf magnet + fp drawing] | ||
# [[Media:fa_test.pdf | Study of H10580 high-rate performance ]] - ''All'' | # [[Media:fa_test.pdf | Study of H10580 high-rate performance ]] - ''All'' | ||
# Preparations for the PS detector construction - ''Ivan'' | # Preparations for the PS detector construction - ''Ivan'' |
Revision as of 13:10, 7 January 2013
Organization
- Time: 11:30 EST
- Place: ESNET and telephone 866-740-1260 (access code 3421244#)
- Connecting: instructions are here
- Present: Richard J., James M., Alex B., Curtis M., Tim W., Alex S., Dan S., Barry R., Mike D., Franz K., Eugene C., and Yi Q.
Agenda
- Announcements
- Desktop conferencing (EVO alternatives) - Richard
- Communication with Yang regarding TOSCA maps - Richard
- Working with the existing tagger magnet map - Dan
- Study of H10580 high-rate performance - All
- Preparations for the PS detector construction - Ivan
- Site visit for the UConn construction contract - Alex
- Progress toward the CUA construction contract - Franz
- Update from Arizona State - Mike
- Preparations for the microscope construction - James
- Meeting with accelerator about active collimator - Alex