** - Optical fibers: received all | ** - Optical fibers: received all | ||
* '''Ongoing projects''' -- Sasha, all | * '''Ongoing projects''' -- Sasha, all | ||
− | ** Tested and labeled ~250 short signal cables [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_13_2023/recently_labeled_cables.jpg Recently labeled cables in boxes)] | + | ** Tested and labeled ~250 short signal cables ([https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_13_2023/recently_labeled_cables.jpg Recently labeled cables in boxes)] |
** Final inspection of installed lead glass and lead tungstate modules [https://logbooks.jlab.org/entry/4196869] | ** Final inspection of installed lead glass and lead tungstate modules [https://logbooks.jlab.org/entry/4196869] | ||
** Meeting with the DSG group to discuss their involvement | ** Meeting with the DSG group to discuss their involvement |
Revision as of 20:17, 14 October 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables: 1360 short cables, all long cables are ready
- - signal patch panels are ready [1]
- - HV cables: 140 short cables (expect to receive most of them in 1-2 weeks), 36 long cables are in production
- - HV distribution boards: have not yet been ordered (need to check multi-pin connector layout)
- - LV cables: ordered, lead time unclear
- - LV distribution boards: have not yet been ordered (need to finalize design, meeting with Chris and Stephanie on Monday next week)
- - Optical fibers: received all
- Ongoing projects -- Sasha, all
- Tested and labeled ~250 short signal cables (Recently labeled cables in boxes)
- Final inspection of installed lead glass and lead tungstate modules [2]
- Meeting with the DSG group to discuss their involvement
- Summer Students (2023)
- Testing of PMT dividers -- Sasha / Vlad
- - Test setup is ready. About 30 dividers are ready for testing
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob
- Light monitoring system
- Analysis/Simulation
- First look at impact of GEMTRD -- Simon