Difference between revisions of "CPP and NPP Readiness Review"
From GlueXWiki
(→Draft Outline Presentations (Tentative Feb 10)) |
(→Draft Outline Presentations (Tentative Feb 10)) |
||
Line 10: | Line 10: | ||
* [[Media:HallD CPP-NPP charge.pdf | Charge]] | * [[Media:HallD CPP-NPP charge.pdf | Charge]] | ||
− | * | + | * Reviewers: |
− | * | + | ** Stepan Stepanyan (chair+muon detector) |
+ | ** Alexandre Cansonne (Trigger) | ||
+ | ** Brad Sawatzky (Tracking System -MWPC) | ||
+ | ** Chris Keith (Target) | ||
+ | ** Robin Wines (Installation) | ||
+ | ** Mikhail Kostin (RadCon) | ||
+ | ** Edy Nissen (Beamline) | ||
+ | ** Javier Gomez (Observer) | ||
+ | ** Ed Folts (Observer) | ||
* Agenda ***DRAFT*** | * Agenda ***DRAFT*** |
Revision as of 15:05, 20 January 2021
Preparations for the CPP and NPP Readiness Review
- Goal: Complete Readiness Review in time to schedule experiment in 2022
- Media:Coarse Acc Schedule 2021.pdf
Contents
Planning for Experiment
Draft Outline Presentations (Tentative Feb 10)
- Reviewers:
- Stepan Stepanyan (chair+muon detector)
- Alexandre Cansonne (Trigger)
- Brad Sawatzky (Tracking System -MWPC)
- Chris Keith (Target)
- Robin Wines (Installation)
- Mikhail Kostin (RadCon)
- Edy Nissen (Beamline)
- Javier Gomez (Observer)
- Ed Folts (Observer)
- Agenda ***DRAFT***
- 08:15-08:45 Executive session
- 08:45-09:35 (30+20) Overview of experiment and setup (Charges: 1, 2. 5, 8) -- Rory Miskimen
- 09:35-10:25 (30+20) Engineering design and installation of the platform and muon chambers (Charges: 2, 3, 4) -- Tim Whitlatch
- 10:25-10:45 Coffee break
- 10:45-11:15 (20+10) Project implementation, resources and schedule (Charges: 3, 6, 7, 9) -- Elton Smith
- 11:15-14:30 Lunch and Executive Session
- 14:30 Closeout
- ERR Final Report
- Addressing ERR Review Recommendations
Additions to Standard Equipment
The major modifications required to operate the experiment are the following
- Design, fabrication and installation of the muon detector
- Multi-wire proportional chambers
- Modifications to the downstream platform, support structure and iron absorbers
- New (mono-isotopic) solid Pb target
- Charged-particle trigger based on the time-of-flight detectors
- Move tagger microscope to cover 6 GeV coherent peak
Platform Design
Trigger Discussion
Discussion topics with Sasha and Hai
- CPP / NPP plan is to run multiple TOF configuration files + FCAL trigger with possibly a lower threshold.
- Confirm that no new firmware is needed for the TOF, i.e. modifications for TOF only need different configuration files
- We would like to run the TOF trigger with multiple configuration files plus the FCAL trigger
References:
Documentation for Review
- CPP Jeopardy Presentation PAC 48 September 24, 2020
- CPP Jeopardy Update PAC 48 June 22, 2020
- CPP wiki page
- NPP wiki page
- Draft Documents
- Drawings for support structure and iron absorbers
- Procedures for installation of muon detector