Revision as of 08:12, 26 March 2014
Present:
Contents
Agenda
- Where are we now?
- Cryo hardware status
- Gas system status
- Exhaust from pressure relief
- Plumbing on cart
- pressure system documentation
- Storage tanks
- 3D model/drawings
- Target/Start counter interface
- Vacuum system update
- Flange config
- Controls status
- updated P&I
- changes for subcooled config
- Installation cart update
- Tank config
- Lifting
- Controls/panel config
- Alignment features
- Scattering chamber status
- Cell Status
- Straight torlon entrance tube
- thermometry
- Spare cell
- Schedule
- Readiness review?
- Assy/test in EEL
- Install/test in Hall
Info
- P&I Diagram Media:Target P&I.pdf
- Controls logic Media:Target controls.pdf
- Dave's SOW Media:Target new SOW.pdf
- Dave's Calcs Media:Target calcs1.pdf Media:Target calcs2.pdf
- Dave's FMEA Media:Target latest FMEA.pdf