*'''Preparation of parts for ECAL''' -- Sasha | *'''Preparation of parts for ECAL''' -- Sasha | ||
− | + | ** - HV long cable, 18 ready (out of 36), discussion with the DSG group regarding help | |
− | + | ** - HV distribution boards: has not yet been designed, need 4 boards | |
− | ** - HV long cable, 18 ready (out of 36) | + | |
− | ** - HV distribution boards: not designed | + | |
** - LV cables: missing about 20 cables, waiting for the last delivery batch. | ** - LV cables: missing about 20 cables, waiting for the last delivery batch. | ||
− | ** - LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/cables/lv_distribution/lv_dist_board.jpg ]. One board out of 4 is ready | + | ** - LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/cables/lv_distribution/lv_dist_board.jpg ]. One board out of 4 is ready, using for testing dividers |
− | ** - LED: | + | ** - LED: prototype board is ready, have to start testing |
− | * '''Ongoing projects''' | + | * '''Ongoing projects''' - All |
** - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_10_2024/May-10-2024-L.pdf Update from Laveen] | ** - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_10_2024/May-10-2024-L.pdf Update from Laveen] | ||
− | |||
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George / Mindy | * '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George / Mindy | ||
** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx] | ** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx] | ||
Line 19: | Line 16: | ||
*** Continue removing regulators from the PCB (about 70 regulators have been removed, require re-testing dividers) | *** Continue removing regulators from the PCB (about 70 regulators have been removed, require re-testing dividers) | ||
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen | * '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen | ||
− | ** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/ | + | ** Installation and testing cables and dividers [https://logbooks.jlab.org/entry/4308819] [https://logbooks.jlab.org/entry/4308979] |
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
− | |||
* '''Summer students''' -- Sasha | * '''Summer students''' -- Sasha | ||
− | ** - | + | ** - Olivia, Ben, and Shane are on site. Expect one student from Wuhan (have to start with the paperwork) |
** - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots | ** - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots | ||
* '''Beam tests with the PS''' | * '''Beam tests with the PS''' | ||
Line 32: | Line 28: | ||
*'''FCAL2 posters for open house''' | *'''FCAL2 posters for open house''' | ||
** JEF/ECAL/FCAL poster (Laveen + students + feedback from all of us) | ** JEF/ECAL/FCAL poster (Laveen + students + feedback from all of us) | ||
− | ** [https://halldweb.jlab.org/wiki/images/2/2c/1-OH24Poster-V-LAVEEN-revised.pdf | + | ** [https://halldweb.jlab.org/wiki/images/2/2c/1-OH24Poster-V-LAVEEN-revised.pdf JEF physics poster] (Laveen) |
*'''Analysis/Simulation''' | *'''Analysis/Simulation''' |
Revision as of 23:14, 23 May 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - HV long cable, 18 ready (out of 36), discussion with the DSG group regarding help
- - HV distribution boards: has not yet been designed, need 4 boards
- - LV cables: missing about 20 cables, waiting for the last delivery batch.
- - LV distribution boards [1]. One board out of 4 is ready, using for testing dividers
- - LED: prototype board is ready, have to start testing
- Ongoing projects - All
- Testing of PMT dividers -- Sasha / Vlad / George / Mindy
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Installation and testing cables and dividers [4] [5]
- Detector installation page
- Summer students -- Sasha
- - Olivia, Ben, and Shane are on site. Expect one student from Wuhan (have to start with the paperwork)
- - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
- Beam tests with the PS
- measure shower beam profile and reconstruction in the crystal/LG transition region
- (install prototype with 5x5 PbWO4 modules + ? LG)
- Other hardware projects
- prototype of the ECAL veto counter (?)
- FCAL2 posters for open house
- JEF/ECAL/FCAL poster (Laveen + students + feedback from all of us)
- JEF physics poster (Laveen)
- Analysis/Simulation