Difference between revisions of "JEF meeting, May 10, 2024"
From GlueXWiki
(→Agenda) |
|||
Line 23: | Line 23: | ||
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
*** (links from the previous meetings [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg]) | *** (links from the previous meetings [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg]) | ||
− | ** ''' | + | ** '''Beam tests with the PS''' |
− | *** measure shower beam profile | + | *** measure shower beam profile and reconstruction in the crystal/LG transition region |
− | *** | + | *** (install prototype with 5x5 PbWO4 modules + ? LG) |
** '''Other hardware projects''' | ** '''Other hardware projects''' | ||
*** --prototype of the ECAL veto counter | *** --prototype of the ECAL veto counter | ||
− | |||
*'''FCAL2 poster for open house?''' | *'''FCAL2 poster for open house?''' | ||
− | ** JEF/ECAL/FCAL poster | + | ** JEF/ECAL/FCAL poster (Laveen + students) |
*'''Analysis/Simulation''' | *'''Analysis/Simulation''' |
Revision as of 08:36, 10 May 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables and 2 patch panels [1] - done
- - HV short cables: done
- - HV long cable, 18 ready (out of 36)
- - HV distribution boards: not designed
- - LV cables: waiting for about 20 cables
- - LV distribution boards [2]. One board out of 4 is ready
- - LED: the prototype of the LED board has been received. Chris will populate it with components
- Ongoing projects
- - Update from Laveen
- - Testing, labeling and bundling LV cables
- Testing of PMT dividers -- Sasha / Vlad / George / Mindy
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Installation of the LMS has been completed [5]
- Installation and testing cables and dividers [6] [7]
- Detector installation page
- Beam tests with the PS
- measure shower beam profile and reconstruction in the crystal/LG transition region
- (install prototype with 5x5 PbWO4 modules + ? LG)
- Other hardware projects
- --prototype of the ECAL veto counter
- FCAL2 poster for open house?
- JEF/ECAL/FCAL poster (Laveen + students)
- Analysis/Simulation