Difference between revisions of "March 26, 2024 KLONG CPS Design Meeting"
From GlueXWiki
(→Minutes) |
(→Minutes) |
||
Line 21: | Line 21: | ||
*** It will make more clearance for GlueX reinstall | *** It will make more clearance for GlueX reinstall | ||
** Ok to have a gap upstream of copper absorber for water lines - total shielding thickness still needed | ** Ok to have a gap upstream of copper absorber for water lines - total shielding thickness still needed | ||
− | ** On downstream end, keep center Cu/W inner block up against the absorber (inside of the water lines) | + | ** On downstream end, keep center Cu/W inner block up against the absorber (inside of the water lines) OK for gap outside this |
== Action Items == | == Action Items == |
Revision as of 14:06, 27 March 2024
Meeting Time and Place
Tuesday, March 26, 2024, 1pm Hall D Counting House
- Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard
Agenda
- Review minutes from last meeting https://halldweb.jlab.org/wiki/index.php/February_27,_2024_KLONG_CPS_Design_Meeting
- Review new basic 3D model and compare to Pavel's model (Pavel, Keith)
- Copper Absorber updated media:Copper absorber.pdf
- Tagger Hall Layout (Stephanie/Keith)
- De-gaussing of Tagger magnet (all)
- Run test with an existing dipole magnet at magnet measurement (Tim, Joe Meyers)
- Magnet update (Josh/Stephanie) media:CPS Magnet Design.pdf
Minutes
- Reviewed minutes from last meeting
- Discussed progress on 3D model
- Discussed possibility of removing borated poly layer from the back side when moving CPS out of beamline
- Pavel will check radiation levels
- It will make more clearance for GlueX reinstall
- Ok to have a gap upstream of copper absorber for water lines - total shielding thickness still needed
- On downstream end, keep center Cu/W inner block up against the absorber (inside of the water lines) OK for gap outside this
- Discussed possibility of removing borated poly layer from the back side when moving CPS out of beamline