Difference between revisions of "JEF meeting, January 19, 2024"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 31: | Line 31: | ||
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob | * '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob | ||
** Detector installation [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg] | ** Detector installation [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg] | ||
− | ** Installation of the LMS [https://halldweb.jlab.org/detectors/fcal2/lms/installation/ready_to_install2.jpg] [https://halldweb.jlab.org/detectors/fcal2/lms/installation/ready_to_install1.jpg] | + | ** Installation of the LMS |
+ | *** Started yesterday (after long delay)[https://halldweb.jlab.org/detectors/fcal2/lms/installation/ready_to_install2.jpg] [https://halldweb.jlab.org/detectors/fcal2/lms/installation/ready_to_install1.jpg] | ||
+ | *** Had to obtain trainings for operating scissor lift (operation without training violates (ed) safety rules) | ||
** [https://halldweb.jlab.org/wiki/index.php/Detector_Alignment Detector survey] | ** [https://halldweb.jlab.org/wiki/index.php/Detector_Alignment Detector survey] | ||
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
** Still no power on the ECAL platform | ** Still no power on the ECAL platform | ||
* [https://halldweb.jlab.org/wiki-private/index.php/GlueX_April_APS_2024 Abstracts for April'24 APS meeting] | * [https://halldweb.jlab.org/wiki-private/index.php/GlueX_April_APS_2024 Abstracts for April'24 APS meeting] |
Revision as of 10:03, 19 January 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables - done
- - signal patch panel [1] - done
- - HV cables: received 165 short cables during this week (1280 in total)
- - HV distribution boards: in preparation
- - LV cables: received first article of short cables, production started on Dec. 7, have not received yet.
- - LV distribution boards. In production
- - Optical fibers and parts for the trigger/DAQ have been ordered
- Ongoing projects -- Sasha, all
- - Testing and labeling cables [2], 120 short HV cables testes and labeled during this week.
- - Prepare modules for the TAC and prototypes (using crystals with some imperfections)
- - Preparation of the LMS
- - Need to glue Al flange to the optical fiber
- - Ready for installation
- - Radiation tests of the PMT active base [5]
- Finished tests, working on the tech note
- - Inventory database and GUI for installed electronics
- - Summer Students (2023)
- Testing of PMT dividers -- Sasha / Vlad / Aoran
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob
- Detector installation [8][9][10]
- Installation of the LMS
- Detector survey
- Detector installation page
- Still no power on the ECAL platform
- Abstracts for April'24 APS meeting