Difference between revisions of "JEF meeting, October 13, 2023"
From GlueXWiki
(→Agenda) |
|||
Line 27: | Line 27: | ||
* '''Light monitoring system''' | * '''Light monitoring system''' | ||
*'''Analysis/Simulation''' | *'''Analysis/Simulation''' | ||
− | ** First look at impact of GEMTRD [[File: | + | ** First look at impact of GEMTRD [[File:gemtrd_Oct23.pdf]] -- Simon |
Revision as of 08:59, 13 October 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables: 1360 short cables, all long cables are ready
- - signal patch panels are ready
- - HV cables: 140 short cables (expect to receive most of them in 1-2 weeks), 36 long cables are in production
- - HV distribution boards: have not yet been ordered (need to check multi-pin connector layout)
- - LV cables: ordered, lead time unclear
- - LV distribution boards: have not yet been ordered (need to finalize design, meeting with Chris and Stephanie on Monday next week)
- - Optical fibers: received all
- Ongoing projects -- Sasha, all
- Tested and labeled ~250 short signal cables
- Final inspection of installed lead glass and lead tungstate modules [1]
- Meeting with the DSG group to discuss their involvement
- Summer Students (2023)
- Testing of PMT dividers -- Sasha / Vlad
- - Test setup is ready. About 30 dividers are ready for testing
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob
- Light monitoring system
- Analysis/Simulation
- First look at impact of GEMTRD File:Gemtrd Oct23.pdf -- Simon