Difference between revisions of "DIRC"
From GlueXWiki
(→DIRC Analysis) |
|||
(19 intermediate revisions by 2 users not shown) | |||
Line 2: | Line 2: | ||
[[GlueX Upgrade PID Meetings]] | [[GlueX Upgrade PID Meetings]] | ||
+ | |||
+ | == DIRC Analysis == | ||
+ | |||
+ | * Dataset summaries: [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary Spring/Summer 2020] | ||
+ | * Reconstruction in [https://github.com/JeffersonLab/halld_recon/tree/master/src/libraries/DIRC halld_recon] | ||
+ | * [https://github.com/JeffersonLab/hd_utilities/tree/master/dirc/standalone Standalone reconstruction] for studies with specific non-standard TTree format | ||
+ | * Using DIRC in the standard Analysis TTree (PART) format: | ||
+ | ** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4607 DSelector Documentation] | ||
+ | ** Suggested studies for new analyzers | ||
== DIRC Detector == | == DIRC Detector == | ||
− | |||
[[File:PixelHit3D Pi+ Bar7 xbin19.gif|200px|thumb|right|DIRC Movie: Bar 7, x=(0,5) cm]] | [[File:PixelHit3D Pi+ Bar7 xbin19.gif|200px|thumb|right|DIRC Movie: Bar 7, x=(0,5) cm]] | ||
Line 40: | Line 48: | ||
=== Ongoing Tests === | === Ongoing Tests === | ||
* [[Water test]] | * [[Water test]] | ||
+ | * [[Mirror prototype test plan]] | ||
+ | |||
+ | == Water Quality Test and Control == | ||
+ | * [[Water Sample Test Tracking]] | ||
+ | |||
+ | == To-do List For Next Major Maintenance == | ||
+ | * [[2020 Winter - 2021 Spring]] | ||
== Commissioning == | == Commissioning == | ||
* [[Spring 2019 DIRC Commissioning]] | * [[Spring 2019 DIRC Commissioning]] | ||
* [[Fall 2019 DIRC Commissioning]] | * [[Fall 2019 DIRC Commissioning]] | ||
+ | * [[Summer 2020 DIRC Commissioning]] | ||
== Reviews == | == Reviews == | ||
Line 51: | Line 67: | ||
== Instructions for Experts == | == Instructions for Experts == | ||
− | * [https://halldweb.jlab.org/hdops/wiki/index.php/ | + | * [https://halldweb.jlab.org/hdops/wiki/index.php/DIRC_Expert_Instructions Expert Instruction Page] |
− | * | + | |
+ | == Shifter Operation Manual == | ||
+ | * [https://halldweb.jlab.org/hdops/wiki/index.php/DIRC_Shift Shifter Operation Manual] | ||
== Spare Equipment == | == Spare Equipment == | ||
Line 58: | Line 76: | ||
* [[Sequence to Recover Non-responding DIRC PMT Modules]] | * [[Sequence to Recover Non-responding DIRC PMT Modules]] | ||
− | == DIRC Operation Tracking == | + | = Documentation = |
+ | * [https://dspace.mit.edu/handle/1721.1/119104 Fast DIRC Thesis] (John Hardin) | ||
+ | |||
+ | = DIRC Operation Issues Tracking = | ||
+ | * [[PMT tiles missing after restarting data taking]] | ||
+ | * [[DIRC LV Power Cycling Schedule]] | ||
+ | |||
+ | = Relevant data validation page = | ||
+ | * [[RunPeriod-2019-11 Validation]] |
Latest revision as of 11:55, 3 August 2022
Contents
DIRC Analysis
- Dataset summaries: Spring/Summer 2020
- Reconstruction in halld_recon
- Standalone reconstruction for studies with specific non-standard TTree format
- Using DIRC in the standard Analysis TTree (PART) format:
- DSelector Documentation
- Suggested studies for new analyzers
DIRC Detector
Fused silica bar boxes
- Documents from BaBar and transportation (on DocDB)
Optical and bar box
- Remaining items from Bates
- Bill's to do list
- Bar box darkening procedure
- Momentive RTV 615 Cookie Documentation
- Square Pattern Diffuser Documnetaition
Multianode PMTs
Electronics
- Level-1 trigger documentation and DIRC readout cabling to rocTrig1
- HallD Online IP Name And Address Conventions: DIRC crate is rocDIRC with IP: 129.57.139.92
- SSP data format document
- Mapping of Cables and Fibers
Software
Slow Controls
- Presentation by Nick Sandoval (June 2018)
- Shift worker instructions (in progress)
Ongoing Tests
Water Quality Test and Control
To-do List For Next Major Maintenance
Commissioning
Reviews
- DIRC Capital Equipment Project Review October 2015
- GlueX-II and DIRC ERR June 2018
Instructions for Experts
Shifter Operation Manual
Spare Equipment
Documentation
- Fast DIRC Thesis (John Hardin)