Difference between revisions of "Π polarizability Meeting Apr 27, 2022"
From GlueXWiki
(→Preliminary Agenda) |
(→Action Items) |
||
Line 47: | Line 47: | ||
== Action Items == | == Action Items == | ||
+ | |||
+ | # Check with Justin about loading translation table into ccdb. (Beni) | ||
+ | # Produce vertex distributions using MC to verify the software is be available for full/empty target commissioning (Andrew) | ||
== Preliminary Agenda == | == Preliminary Agenda == |
Revision as of 08:15, 21 April 2022
09:30 EST (JLab time) Weekly Meeting
REMOTE during Covid-19
Connecting
Join ZoomGov Meeting
https://jlab-org.zoomgov.com/j/1608628791?pwd=bXhtZjdNRi8xeXZqWFh5T1R3TDBFdz09
Meeting ID: 160 862 8791
Passcode: CPP
Elton Smith is inviting you to a scheduled ZoomGov meeting. Topic: CPP Weekly Meeting Time: This is a recurring meeting Meet anytime Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1608628791?pwd=bXhtZjdNRi8xeXZqWFh5T1R3TDBFdz09 Meeting ID: 160 862 8791 Passcode: CPP One tap mobile +16692545252,,1608628791# US (San Jose) +16468287666,,1608628791# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 862 8791 Find your local number: https://jlab-org.zoomgov.com/u/acZK7hDWFf Join by SIP 1608628791@sip.zoomgov.com Join by H.323 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 160 862 8791 Passcode: 112160
Action Items
- Check with Justin about loading translation table into ccdb. (Beni)
- Produce vertex distributions using MC to verify the software is be available for full/empty target commissioning (Andrew)
Preliminary Agenda
- Previous CPP meeting: Apr 20, 2022
- Previous CPP Software meeting: Π polarizability Software Meeting Apr 21, 2022
- Announcements
- GlueX Collaboration Meeting May 23-26 (Tue - software/tutiorials, Wed-Thu)
- Shifts/RCs. Aleandre Deur has volunteered to serve as RC for the first two weeks.
- Run Coordinator Meeting for CPP will start in the next 2-3 weeks and increase in frequency as we get closer to beam
- JLab is still under a Continuing Resolution (CR)
- Accelerator beam energy is expected to be about 11.55 GeV
- Action Items
- CPP-NPP Trigger (Sasha)
- Fiber connections for DAQ integration
- Fiber connections for FP trigger for CTOF
- TOF trigger for CPP
- FCAL/BCAL trigger for NPP
- CPP and NPP Run Conditions
- AIEC: CDC HV Media:20220420_CDC_Cosmics_AI.png
- Photon beam / tagger / diamonds
- Software/Calibration
- Simulations
- MWPC Testing
- CPP and NPP Experiment Configuration
- DAQ and Electronic Setup (Sergey and Beni)
- Other business
- Next meeting
Minutes
Present: