June 04, 2020 CPP Design Meeting
From GlueXWiki
Meeting Time and Place =
Thursday June 04, 2020, 1:30pm Bluejeans https://bluejeans.com/735541157/3638?src=calendarLink
- Present - Elton, Dave, Stephanie, Llya, Rory (remote)
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/May_21,_2020_CPP_Design_Meeting#Minutes_and_Action_Items
- Overall description https://halldweb.jlab.org/DocDB/0041/004180/006/CPP_update_oct19.pdf
- FY2020 Procurement possibilities Media:CPP_Procurement_schedule.docx
- Design/Fab/Install schedule Media:CPP_install_schedule.pdf
- 3D model - show progress
- Upcoming run, possible tests Media:CPP_Tests.pdf
- Things to work out
- Gas line manifold
- Adjustable lead absorber
- Procurement/installation schedule
- Alignment hardware
- Electronics shielding Media:Muon_Chamber_Shielding.pdf
- Complete structural analysis
- Develop installation plan
- Develop Design/operational/Maintenance Requirements
Minutes and Action Items
- Reviewed minutes of last meeting
- Develop a procurement priority list for FY2020 and 2021 - Tim
- Changed design to allow 4 feet of travel of FCAL/CPP stand Z movement to retract DIRC
- Modified design to tie the 2 US thompson rail carriages together to help with installation
- Ilya to simulate steel/lead configuration 1/4" steel, 4" lead, 1/4" steel (moveable portion)
1/4"steel, 2" lead, 1/4" steel (fixed portion)
- leave inner edges of cutouts with lead exposed (no steel)
- Set up new meeting in 2 weeks