JEF meeting, September 8, 2023

From GlueXWiki
Jump to: navigation, search

Meeting time and location:

Agenda

  • Preparation of parts for ECAL modules -- Sasha
    • Crystals:
      - Received 70 crystals from SICCAS. Visual inspection: 4 dim crystals, 8 with many chips (consider to send them back to SICCAS) [1][2]
      - Plan to send back about 10 crystals
    • Received 1100 short signal cables [3]
    • Procurement parts for the LMS:
      - Waiting for 7,600 ft of optical fibers. PR department prepared PO but forgot to send it out
  • Module fabrication -- Sasha
    • All modules have been fabricated, checked, and inventorized (about 1610 modules in total)
  • Ongoing projects -- Sasha, all
    • Visual inspections of fabricated modules [4] - done
    • All crystals moved to Hall D[5] [6][7] - done
    • Tested, labeled, and bundled all 100 (+ 2 spares) [8] signal cables connected from the flash ADC to the patch panel [9] - done
    • Test and label 1100 short signal cables - ongoing
    • Tested fabricated modules using LMS [10] - done (need to update the wiki page)
    • Cutting optical fibers and gluing plastic caps [11], waiting for 7600 ft of optical fibers
    • Work on refurbishing LG modules rejected during installation
      - Fixed about 120 modules with different small issues: soldering compound bumps on the brass assembly, small bubbles on silicon cookies, small issues with wrapping
      - Mindy is working on re-wrapping of about 30 crystals. She also continues soldering wires to the PMT connectors
    • Report from students
  • Testing of PMT dividers -- Sasha / Vlad
    • -Continue with testing dividers, should be done during this/next week
  • Proceedures
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak / Vlad / Hakob
  • Light monitoring system -- Arshak
  • Discussion of the budget request for 2024 -- Sasha (all)
  • Miscellaneous
- Profiler to measure shower shape
- Veto in the insert region
  • Simulation/Analysis
    • Pictures of potential PID/Veto upgrade -- Simon

Fcal2 with itof.png Magenta shows potential "inner TOF" upgrade]] New tof.png revised TOF for high rate running

Minutes

Attendees: Igal, Zisis, Phil, Axel, Bill, Jane, Arshak, Olga, Sasha, Jon, Liping, Malte, S.T.

  • Refurbishment of some fcal-2 modules taking place in EEL126 due to bumps in brass straps and other issues
    • Need to make surface as flat as reasonable to reduce likelihood of cracking when installed
      • Removed excess with soldering iron, will reinstall
    • Inspected cookies looking for bubbles
    • Put modules with chipped crystals aside
  • Now news regarding outstanding set of optical fibers for LMS
  • First article PMT dividers under study, everything looks good, green light for full order soon
  • Found 0.3 degree tilt of entire FCAL frame, to be adjusted after ECAL installation complete
  • ECAL installed up to layer 36
  • Platform for crates ready, 4 racks needed
  • Simon showed preliminary geant drawings for potential veto/inner TOF for insert region and modification of existing TOF for high rate running
    • Need better time resolution if more than veto counters
    • Granularity and readout to be designed