JEF meeting, May 26, 2023
From GlueXWiki
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL modules -- Sasha
- Crystals:
- Received 60 crystals from CRYTUR [1]. Remaining 35 crystals are expected to be delivered to the Lab in May/June.
- Contract with the SICCAS and delivery of crystals
- Wrapped crystals during last week: 10
- Available for wrapping: 10 CRYTUR
- Received 875 long signal cables
- Procurement parts for the LMS:
- 16,400 ft of optical fibers delivered to the lab. 7,600 will be delivered in September.
- Expect to receive all plastic caps for the LMS during next week
- Crystals:
- Module fabrication -- Sasha
- Fabricated modules: Total 1562
- 4 modules fabricated during last week
- Report from students
- Fabricated modules: Total 1562
- Visual inspections of fabricated modules [2]
- -1056 modules have been checked (273 SICCAS + 783 CRYTUR) [3]
- Testing and labeling cables
- Cable tester and label maker
- - 600 long signal cables have been tested [4]
- Cable tester and label maker
- Testing of PMT dividers -- Sasha / Vlad
- Most parts for the active base have been arrived to the lab (including PCBs)
- All dividers will be ordered during next week (by Chris S.)
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group [5]
- Discussion of the FCAL2 installation procedures [6]
- Final mapping of low-voltage cables
- Manpower and division of tasks
- Projects for summer students
- Summer Students (2023)
- Light monitoring system -- Arshak
- Simulations/Analysis
Minutes
Attendees: Arshak, Liping, Sasha, Olga, Bill, Jon, Jane, S.T.
- Crytur crystals still arriving at lab
- Expect 10 more soon (45 remaining)
- Signal cables arrived, need to be checked using cable tester
- Need to pull 400 cables from Hall (also ordered 400 more cables, but lead time is very long)
- Label maker arrived
- Total number of fabricated modules now 1558
- Visual inspections continue (715 inspected)
- Next week begin testing modules
- PMT divider saturation issue resolved, parts in place, boards to be sent out to outside company to populate with components (20 day lead time)
- Module stacking test underway
- No shims yet
- Need to verify torque
- Re-stacking to start July 11