JEF meeting, March 10, 2023
From GlueXWiki
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation of parts for FCAL2 modules -- Sasha
- Available crystals:
- 1450 (modules)
- 32 (ready for fabrication)
- 40 (installed on CCAL) available on March 20
- (some CCAL crystals from the inner part will not be used for the FCAL2)
- 95 expect to receive from CRYTUR in May [1]
- Total 1617
- Wrapped crystals: 32 (Mindy)
- George (DSG group) finished with disassembling CCAL modules and removing LMS caps. Will work on preshaping ESR reflectors for CRYTUR. The oven will be ready in a week.
- Mindy (DSG group) solder wires to sockets (while waiting for crystals). More crystals will come from the CCAL after the run in the end of March.
- Parts. 60 remaining PMT housings and cylinders have been ordered by Tim; should be ready for fabrication in about 2 months
- Available crystals:
- Module fabrication -- Sasha
- Fabricated modules: Total 1455 (5 modules fabricated since last week)
- Currently available for fabrication: 27
- Fabricated modules: Total 1455 (5 modules fabricated since last week)
- Testing of PMT dividers -- Sasha / Arshak
- FCAL2 modules with dividers installed on the CCAL [2]
- Installation of the FCAL2 detector -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group [3]
- Manpower and division of tasks
- Projects for summer students
- Summer Students (2023)
- Light Monitoring System -- Arshak
- Simulations/Analysis
Minutes
Attendees: Arshak, Sasha, Phil, Bill, Zisis, Igal, Susan, Jane, Olga, S.T.
- Grand total of fabricated modules now 1455
- Received ESR foil, George from detector support group preshaping for 95 Crytur crystals due in May
- Mindy from detector support group wrapped all available crystals
- No news on PMT housing, due within the next 2 months
- Sasha took data using new PMT dividers in 5x5 CCAL
- New PCBs with new connector for LV coming soon
- After run ends, need to convert 40 CCAL modules into FCAL-2 modules
- ~11 students in the pipeline for summer work (module fabrication/testing, ...)
- Deferred discussion of LMS until next meeting
- Discussion of impact of GEMTRD proposal continued