GlueX Target Design Mtg, July 10, 2013

From GlueXWiki
Jump to: navigation, search

Present: Dave Meekins, Jim Fochtman, Mark Ito, Josh Pierce, Tim Whitlatch,

Agenda

  • Floyd taking over for Hall D
  • Review notes from last mtg
  • Jim Design details
  • Fabrication update
  • Controls update
  • Gas panel update

Info


Notes from last week

  • Gas panel, all ordered, waiting on relief valves and pressure switch
  • Hall D will take care of cart design and analysis, need panel/cart interface
  • Work on shielding/fill tube design, most decisions made
  • Scattering chamber design done, will be glue, need dwgs, will be aluminum for test, rohacel/Dp190 for production.
  • Need to review FMEA
  • Look at design for next mtg
  • Alum target base is made - Mark needs to ok for physics
  • All drawings will be released through Hall D. Hall D will assign numbers.
  • Piping for vent waiting on final design. 2" tube , 5' above roof line.Kausch to sign vent dwgs
  • Gas panel needs PT inspection, need as built drawings