Difference between revisions of "Testing of PMT dividers"

From GlueXWiki
Jump to: navigation, search
 
(3 intermediate revisions by the same user not shown)
Line 6: Line 6:
 
</gallery>
 
</gallery>
  
 +
'''[[Final test of dividers]]'''
  
  
Line 48: Line 49:
 
<gallery>
 
<gallery>
 
Image:before_saturation_fern.png | Fig. 1 Original base before saturation
 
Image:before_saturation_fern.png | Fig. 1 Original base before saturation
Image:after_saturation_fern.png | Fig. 1 Original base, A = 1.8 V
+
Image:after_saturation_fern.png | Fig. 2 Original base, A = 1.8 V
 +
Image:new_ops.png | Fig. 3 Modified OPS
 
</gallery>
 
</gallery>

Latest revision as of 09:43, 19 October 2023

New version of the active base

Final test of dividers


Bench tests


Study noise inside FCAL



Installing 5x5 prototype on CCAL


Cables, and patch panels


Tuning dividers after the CCAL beam test