''' New version of the active base'''
 +
<gallery>
 +
Image:new_base2.jpg  |  Fig. 1  Connectors on the new base
 +
Image:new_base3.jpg  |  Fig. 2  Connectors on the new base
 +
Image:new_base1.jpg  |  Fig. 3  Extension of the PCB to accommodate the new connector
 +
</gallery>
 +
 +
'''[[Final test of dividers]]'''
 +
 +
 
''' Bench tests'''
 
''' Bench tests'''
  
Line 33: Line 43:
 
Image:ccal_prot_cables4.jpg  |  Fig. 4 - Patch panels: LV distribution for the 5x5 prototype (right)   
 
Image:ccal_prot_cables4.jpg  |  Fig. 4 - Patch panels: LV distribution for the 5x5 prototype (right)   
 
Image:ccal_prot_cables5.jpg  |  Fig. 5 - Patch panel from the outside of the CCAL (the MPOD connector is on the left)
 
Image:ccal_prot_cables5.jpg  |  Fig. 5 - Patch panel from the outside of the CCAL (the MPOD connector is on the left)
 +
</gallery>
 +
 +
 +
'''Tuning dividers after the CCAL beam test '''
 +
<gallery>
 +
Image:before_saturation_fern.png | Fig. 1 Original base before saturation
 +
Image:after_saturation_fern.png | Fig. 2 Original base, A = 1.8 V
 +
Image:new_ops.png | Fig. 3 Modified OPS
 
</gallery>
 
</gallery>

Latest revision as of 09:43, 19 October 2023

New version of the active base

Final test of dividers


Bench tests


Study noise inside FCAL



Installing 5x5 prototype on CCAL


Cables, and patch panels


Tuning dividers after the CCAL beam test