Difference between revisions of "Testing of PMT dividers"

From GlueXWiki
Jump to: navigation, search
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
''' New version of the active base'''
 +
<gallery>
 +
Image:new_base2.jpg  |  Fig. 1  Connectors on the new base
 +
Image:new_base3.jpg  |  Fig. 2  Connectors on the new base
 +
Image:new_base1.jpg  |  Fig. 3  Extension of the PCB to accommodate the new connector
 +
</gallery>
 +
 +
'''[[Final test of dividers]]'''
 +
 +
 
''' Bench tests'''
 
''' Bench tests'''
  
Line 32: Line 42:
 
Image:ccal_prot_cables2.jpg  |  Fig. 3 - Closer look of dividers
 
Image:ccal_prot_cables2.jpg  |  Fig. 3 - Closer look of dividers
 
Image:ccal_prot_cables4.jpg  |  Fig. 4 - Patch panels: LV distribution for the 5x5 prototype (right)   
 
Image:ccal_prot_cables4.jpg  |  Fig. 4 - Patch panels: LV distribution for the 5x5 prototype (right)   
Image:ccal_prot_cables5.jpg  |  Fig. 5 - Patch panel from the outside of the CCAL
+
Image:ccal_prot_cables5.jpg  |  Fig. 5 - Patch panel from the outside of the CCAL (the MPOD connector is on the left)
 +
</gallery>
 +
 
 +
 
 +
'''Tuning dividers after the CCAL beam test '''
 +
<gallery>
 +
Image:before_saturation_fern.png | Fig. 1 Original base before saturation
 +
Image:after_saturation_fern.png | Fig. 2 Original base, A = 1.8 V
 +
Image:new_ops.png | Fig. 3 Modified OPS
 
</gallery>
 
</gallery>

Latest revision as of 09:43, 19 October 2023

New version of the active base

Final test of dividers


Bench tests


Study noise inside FCAL



Installing 5x5 prototype on CCAL


Cables, and patch panels


Tuning dividers after the CCAL beam test