Difference between revisions of "Testing of PMT dividers"

From GlueXWiki
Jump to: navigation, search
 
(15 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
''' New version of the active base'''
 +
<gallery>
 +
Image:new_base2.jpg  |  Fig. 1  Connectors on the new base
 +
Image:new_base3.jpg  |  Fig. 2  Connectors on the new base
 +
Image:new_base1.jpg  |  Fig. 3  Extension of the PCB to accommodate the new connector
 +
</gallery>
 +
 +
'''[[Final test of dividers]]'''
 +
 +
 
''' Bench tests'''
 
''' Bench tests'''
  
Line 12: Line 22:
  
  
''' Installing 5x5 prototype on CCAL '''
 
  
 +
 +
<span style="color:#FFFF00; background:#00C000">
 +
''' Installing 5x5 prototype on CCAL '''
 +
</span>
  
 
<gallery>
 
<gallery>
Line 21: Line 34:
 
</gallery>
 
</gallery>
  
''' Installing cables, and patch panels  '''
 
  
 +
''' Cables, and patch panels  '''
 +
 +
<gallery>
 +
Image:ccal_prot_cables1.jpg  |  Fig. 1 - Cables connected to the FCAL2 dividers (signal, HV, and LV)
 +
Image:ccal_prot_cables3.jpg  |  Fig. 2 - Cables connected to the FCAL2 dividers (signal, HV, and LV)
 +
Image:ccal_prot_cables2.jpg  |  Fig. 3 - Closer look of dividers
 +
Image:ccal_prot_cables4.jpg  |  Fig. 4 - Patch panels: LV distribution for the 5x5 prototype (right) 
 +
Image:ccal_prot_cables5.jpg  |  Fig. 5 - Patch panel from the outside of the CCAL (the MPOD connector is on the left)
 +
</gallery>
 +
 +
 +
'''Tuning dividers after the CCAL beam test '''
 
<gallery>
 
<gallery>
Image:ccal_prot_cables1.jpg  | Fig. 1 - Front view of the CCAL
+
Image:before_saturation_fern.png | Fig. 1 Original base before saturation
Image:ccal_prot_cables2.jpg  | Fig. 2 - Rear view of the CCAL
+
Image:after_saturation_fern.png | Fig. 2 Original base, A = 1.8 V
Image:ccal_prot_cables3.jpg  |  Fig. 3 - List of modules installe
+
Image:new_ops.png | Fig. 3 Modified OPS
Image:ccal_prot_cables4.jpg  |  Fig. 3 - List of modules installe
+
Image:ccal_prot_cables5.jpg  | Fig. 3 - List of modules installe
+
 
</gallery>
 
</gallery>

Latest revision as of 09:43, 19 October 2023

New version of the active base

Final test of dividers


Bench tests


Study noise inside FCAL



Installing 5x5 prototype on CCAL


Cables, and patch panels


Tuning dividers after the CCAL beam test