Difference between revisions of "Testing of PMT dividers"

From GlueXWiki
Jump to: navigation, search
Line 42: Line 42:
 
Image:ccal_prot_cables4.jpg  |  Fig. 4 - Patch panels: LV distribution for the 5x5 prototype (right)   
 
Image:ccal_prot_cables4.jpg  |  Fig. 4 - Patch panels: LV distribution for the 5x5 prototype (right)   
 
Image:ccal_prot_cables5.jpg  |  Fig. 5 - Patch panel from the outside of the CCAL (the MPOD connector is on the left)
 
Image:ccal_prot_cables5.jpg  |  Fig. 5 - Patch panel from the outside of the CCAL (the MPOD connector is on the left)
 +
</gallery>
 +
 +
 +
'''Tuning dividers after the CCAL beam test '''
 +
<gallery>
 +
Image:before_saturation.jpg | Fig. 1 Original base before saturation
 
</gallery>
 
</gallery>

Revision as of 09:27, 26 May 2023

New version of the active base


Bench tests


Study noise inside FCAL



Installing 5x5 prototype on CCAL


Cables, and patch panels


Tuning dividers after the CCAL beam test