Difference between revisions of "Testing of PMT dividers"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
 
''' New version of the active base'''
 
''' New version of the active base'''
 
<gallery>
 
<gallery>
Image:new_base1.jpg  | Fig. 1 Setup for testing PMT dividers
+
Image:new_base2.jpg  | Fig. 1 Connectors on the new base
Image:new_base2.jpg | Fig. 2 Bypassed amplifier, small amplitude
+
Image:new_base3.jpg | Fig. 2 Connectors on the new base
Image:new_base3.jpg |  Fig. 3 Bypassed amplifier, large amplitude
+
Image:new_base1.jpg |  Fig. 3 Extension of the PCB to accommodate the new connector
 
</gallery>
 
</gallery>
  

Revision as of 09:29, 28 April 2023

New version of the active base


Bench tests


Study noise inside FCAL



Installing 5x5 prototype on CCAL


Cables, and patch panels