Difference between revisions of "Status of motor applications 05/01/2014"

From GlueXWiki
Jump to: navigation, search
 
Line 1: Line 1:
 +
 
{| border="1" cellpadding="2" align="center" valign="top"
 
{| border="1" cellpadding="2" align="center" valign="top"
 
!width="150"  | Application name
 
!width="150"  | Application name
Line 9: Line 10:
 
|-
 
|-
 
|-
 
|-
| Goniometer           || 5 || Tested                                    ||  In production              || Not installed      || Partially ready        || Wired in FEL  
+
| Goniometer                                     || 5 || Tested                                    ||  In production              || Not installed      || Partially ready        || Wired in FEL  
 
|-
 
|-
| Microscope           || 3 || Not tested                                ||  Manufactured              || Installed on stage || Does not exist        || Ready for test in EEL, will go to UCONN  
+
| <span style="color: red;"> Microscope </span> || 3 || Not tested                                ||  Manufactured              || Installed on stage || Does not exist        || Ready for test in EEL, will go to UCONN  
 
|-
 
|-
| Amorphous radiator   || 1 || Tested                                    ||  Manufactured              || Not installed      || Partially ready        || In the tagger hall, not wired     
+
| Amorphous radiator                             || 1 || Tested                                    ||  Manufactured              || Not installed      || Partially ready        || In the tagger hall, not wired     
 
|-
 
|-
| Collimator           || 1 || Installed, not surveyed, not tested      ||  Manufactured              || Not installed      || Ready, needs survey    || In the hall, not wired, needs to be wired
+
| <span style="color: red;"> Collimator </span> || 1 || Installed, not surveyed, not tested      ||  Manufactured              || Not installed      || Ready, needs survey    || In the hall, not wired, needs to be wired
 
|-
 
|-
| PS Converter         || 1 || Not tested                                ||  Manufactured              || Not installed      || Partially ready        || Not wired in FEL, limit switches need connectors
+
| PS Converter                                   || 1 || Not tested                                ||  Manufactured              || Not installed      || Partially ready        || Not wired in FEL, limit switches need connectors
 
|-  
 
|-  
| TAC                 || 1 || Does not exist                            ||  Partially Manufactured    || Not installed      || Does not exist        || Need to make the stage
+
| TAC                                           || 1 || Does not exist                            ||  Partially Manufactured    || Not installed      || Does not exist        || Need to make the stage
 
|-
 
|-

Latest revision as of 08:37, 1 May 2014

Application name # of axes Stage status Cable status Connectors Software Comments
Goniometer 5 Tested In production Not installed Partially ready Wired in FEL
Microscope 3 Not tested Manufactured Installed on stage Does not exist Ready for test in EEL, will go to UCONN
Amorphous radiator 1 Tested Manufactured Not installed Partially ready In the tagger hall, not wired
Collimator 1 Installed, not surveyed, not tested Manufactured Not installed Ready, needs survey In the hall, not wired, needs to be wired
PS Converter 1 Not tested Manufactured Not installed Partially ready Not wired in FEL, limit switches need connectors
TAC 1 Does not exist Partially Manufactured Not installed Does not exist Need to make the stage