Application name | # of axes | Stage status | Cable status | Connectors | Software | Comments |
---|---|---|---|---|---|---|
Goniometer | 5 | Tested | In production | Not installed | Partially ready | Wired in FEL |
Microscope | 3 | Not tested | Manufactured | Installed on stage | Does not exist | Ready for test in EEL, will go to UCONN |
Amorphous radiator | 1 | Tested | Manufactured | Not installed | Partially ready | In the tagger hall, not wired |
Collimator | 1 | Installed, not surveyed, not tested | Manufactured | Not installed | Ready, needs survey | In the hall, not wired, needs to be wired |
PS Converter | 1 | Not tested | Manufactured | Not installed | Partially ready | Not wired in FEL, limit switches need connectors |
TAC | 1 | Does not exist | Partially Manufactured | Not installed | Does not exist | Need to make the stage |