Difference between revisions of "Status of motor applications 05/01/2014"

From GlueXWiki
Jump to: navigation, search
(Created page with "TEst")
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
TEst
+
 
 +
{| border="1" cellpadding="2" align="center" valign="top"
 +
!width="150"  | Application name
 +
!width="50"  | # of axes
 +
!width="250"  | Stage status
 +
!width="200"  | Cable status
 +
!width="200"  | Connectors
 +
!width="150"  | Software
 +
!width="450"  | Comments
 +
|-
 +
|-
 +
| Goniometer                                    || 5 || Tested                                    ||  In production              || Not installed      || Partially ready        || Wired in FEL
 +
|-
 +
| <span style="color: red;"> Microscope  </span> || 3 || Not tested                                ||  Manufactured              || Installed on stage || Does not exist        || Ready for test in EEL, will go to UCONN 
 +
|-
 +
| Amorphous radiator                            || 1 || Tested                                    ||  Manufactured              || Not installed      || Partially ready        || In the tagger hall, not wired   
 +
|-
 +
| <span style="color: red;"> Collimator  </span> || 1 || Installed, not surveyed, not tested      ||  Manufactured              || Not installed      || Ready, needs survey    || In the hall, not wired, needs to be wired
 +
|-
 +
| PS Converter                                  || 1 || Not tested                                ||  Manufactured              || Not installed      || Partially ready        || Not wired in FEL, limit switches need connectors
 +
|-
 +
| TAC                                            || 1 || Does not exist                            ||  Partially Manufactured    || Not installed      || Does not exist        || Need to make the stage
 +
|-

Latest revision as of 08:37, 1 May 2014

Application name # of axes Stage status Cable status Connectors Software Comments
Goniometer 5 Tested In production Not installed Partially ready Wired in FEL
Microscope 3 Not tested Manufactured Installed on stage Does not exist Ready for test in EEL, will go to UCONN
Amorphous radiator 1 Tested Manufactured Not installed Partially ready In the tagger hall, not wired
Collimator 1 Installed, not surveyed, not tested Manufactured Not installed Ready, needs survey In the hall, not wired, needs to be wired
PS Converter 1 Not tested Manufactured Not installed Partially ready Not wired in FEL, limit switches need connectors
TAC 1 Does not exist Partially Manufactured Not installed Does not exist Need to make the stage