Difference between revisions of "Sep 7, 2017 Calorimeter"

From GlueXWiki
Jump to: navigation, search
(Minutes)
Line 54: Line 54:
 
# FCAL Update
 
# FCAL Update
 
## [https://halldweb.jlab.org/wiki/images/5/5c/MStaibFCALGains7Sep2017.pdf FCAL Gains] - Mike
 
## [https://halldweb.jlab.org/wiki/images/5/5c/MStaibFCALGains7Sep2017.pdf FCAL Gains] - Mike
 +
##* Investigating omega sample and occupancies in FCAL near beam hole
 +
##* Finds that apparent inefficient channels are due to mis-calibration in regions where FCAL blocks were excluded from the trigger.
 +
##* Borrowing Will's new procedure for determining BCAL gains using a
 
## [[Media:Fcal_7sep2017.pdf | FCAL Update (Matt)]]
 
## [[Media:Fcal_7sep2017.pdf | FCAL Update (Matt)]]
 
# BCAL update
 
# BCAL update

Revision as of 13:15, 7 September 2017

Video Conferencing Information

Meeting Time: 11:00 a.m.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
  3. To join via phone, use one of the following numbers and the Conference ID: 907185247.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Participant Direct Lines

  • JLab Phone in CC L207 is 757-269-7084 (usual room)
  • JLab Phone: in CC F326 is 757-269-6460
  • Phone in the Regina Video-conference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Action Items

  1. Check in the code, including scripts, that is used for recent calibrations into git (BCAL: Mark)
  2. Add Fcal dead channels into the MC
  3. Matt will send a question to Sean on how tightly the calibration constants are coupled to the software version. Matt contacted Sean and there is no direct coupling between constants and software versions.

References

  1. FCAL HDFCAL log book
  2. BCAL HDBCAL log book

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Activities during the down
  4. FCAL Update
    1. FCAL Gains - Mike
    2. FCAL Update (Matt)
  5. BCAL update
  6. Calibrations
  7. Reconstruction and Simulation
    1. 2017 mcsmear Workplan
  8. NIM articles
  9. Any other business

Minutes

Attendees: Elton, Mark, Colin Gleason (JLab); Matt, Jon (IU); Ahmed, Tegan, Andrei (UofR); Will, Mike, Curtis (CMU); Christina, George (Athens); Sean (NW).

  1. Announcements
    • Colin Gleason is replacing Adesh as IU's representative at JLab. Welcome!
  2. Action Items
  3. Activities during the down
  4. FCAL Update
    1. FCAL Gains - Mike
      • Investigating omega sample and occupancies in FCAL near beam hole
      • Finds that apparent inefficient channels are due to mis-calibration in regions where FCAL blocks were excluded from the trigger.
      • Borrowing Will's new procedure for determining BCAL gains using a
    2. FCAL Update (Matt)
  5. BCAL update
  6. Calibrations
  7. Reconstruction and Simulation
    1. 2017 mcsmear Workplan
  8. NIM articles
  9. Any other business