Run Planning Meeting Notes, June 23 - June 29, 2022
From GlueXWiki
↑ Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Thursday June 23
- Last 24h:
- Inadvertent change to tagger magnet settings backed out
- Target moved out
- Richard took the microscope scan data
- Bleedthrough beam current was very low
- Thunderstorms made TAC run impossible.
- Sasha configured the trigger for straight track running
- Beam back near midnight but ran into DAQ problems.
- Overnight empty target production
- Shift Summaries
- Reports
- From MCC: Reminder that 911 from lab phone is forwarded to normal 911 and also automatically informs the crew chief, guard shack, etc that there's an emergency, crew are CPR qualified & have AED. This doesn't happen from RC phones (or cellphones).
- Power shed 3-4pm today, beam restoration likely 5pm+.
- MCC planning to raise the current to Hall C.
- Issues
- DAQ crash ROCTRIG2 - called Sergey
- DAQ lost comms with ROCBCAL11 - stop & restart DAQ fixed this
- AD00C x position moving
- (Tagger NMR)
- (DIRC sensor)
- (DAQ livetime)
- (Beam position stability)
- (U1-10-TOP MPOD crate)
- Plans
- No beam until swing.
- Walk-through at 11am
- Site exit opposite Tech Center closed most of the day - need to exit by resfac or Lidl.
- Commissioning steps temporarily postponed:
- Flux optimization/Act .Col. calibration
- Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.