(Thursday June 23)
(Thursday June 23)
Line 14: Line 14:
 
#* [https://logbooks.jlab.org/entry/4005879 Inadvertent change to tagger magnet settings] [https://logbooks.jlab.org/entry/4005898 backed out]  
 
#* [https://logbooks.jlab.org/entry/4005879 Inadvertent change to tagger magnet settings] [https://logbooks.jlab.org/entry/4005898 backed out]  
 
#* [https://logbooks.jlab.org/entry/4005934 Target moved out]
 
#* [https://logbooks.jlab.org/entry/4005934 Target moved out]
#* [https://logbooks.jlab.org/entry/4005968 Richard took the microscope scan data]
+
#* [https://logbooks.jlab.org/entry/4005968 Richard took the microscope scan data] needs another 20 mins
 
#* [https://logbooks.jlab.org/entry/4005967 Bleedthrough beam current was very low]  
 
#* [https://logbooks.jlab.org/entry/4005967 Bleedthrough beam current was very low]  
 
#* Thunderstorms made TAC run impossible.  
 
#* Thunderstorms made TAC run impossible.  
Line 39: Line 39:
 
#*Walk-through at 11am
 
#*Walk-through at 11am
 
#*Site exit opposite Tech Center closed most of the day - need to exit by resfac or Lidl.  
 
#*Site exit opposite Tech Center closed most of the day - need to exit by resfac or Lidl.  
 +
#*Put the target back (done).
 +
#*Sasha - check straight target configuration.
 +
#*Sasha - make new CPP configuration as requested by email
 +
#*Richard - repeat 2 rows in microscope scan
 +
#*Return to production. Cycle through 240M events for each of perp, perp, para, para, then 60M events on the AMO on the goniometer.
 +
#*Production as above should be our default for 6d, with 1d on empty target.
 
#Commissioning steps temporarily postponed:
 
#Commissioning steps temporarily postponed:
 
#*Flux optimization/Act .Col. calibration
 
#*Flux optimization/Act .Col. calibration
 
#*Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.
 
#*Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.

Revision as of 10:59, 23 June 2022

↑ Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Thursday June 23

  1. Last 24h:
  2. Shift Summaries
  3. Reports
    • From MCC: Reminder that 911 from lab phone is forwarded to normal 911 and also automatically informs the crew chief, guard shack, etc that there's an emergency, crew are CPR qualified & have AED. This doesn't happen from RC phones (or cellphones). No problem w 911 from other phone; if there's a lab phone handy it saves some time.
    • Power shed 3-4pm today, beam restoration likely 5pm+.
    • MCC planning to raise the current to Hall C.
  4. Issues
  5. Plans
    • No beam until swing.
    • Walk-through at 11am
    • Site exit opposite Tech Center closed most of the day - need to exit by resfac or Lidl.
    • Put the target back (done).
    • Sasha - check straight target configuration.
    • Sasha - make new CPP configuration as requested by email
    • Richard - repeat 2 rows in microscope scan
    • Return to production. Cycle through 240M events for each of perp, perp, para, para, then 60M events on the AMO on the goniometer.
    • Production as above should be our default for 6d, with 1d on empty target.
  6. Commissioning steps temporarily postponed:
    • Flux optimization/Act .Col. calibration
    • Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.