Difference between revisions of "Run Planning Meeting Notes, June 23 - June 29, 2022"

From GlueXWiki
Jump to: navigation, search
(Thursday June 23)
(Thursday June 23)
Line 23: Line 23:
 
#* [https://logbooks.jlab.org/entry/4005862 day] [https://logbooks.jlab.org/entry/4006016 swing] [https://logbooks.jlab.org/entry/4006118 owl] [https://logbooks.jlab.org/entry/4006219 early riser]
 
#* [https://logbooks.jlab.org/entry/4005862 day] [https://logbooks.jlab.org/entry/4006016 swing] [https://logbooks.jlab.org/entry/4006118 owl] [https://logbooks.jlab.org/entry/4006219 early riser]
 
#Reports
 
#Reports
 +
#*From MCC: Reminder that 911 from lab phone is forwarded to normal 911 and also automatically informs the crew chief, guard shack, etc that there's an emergency, crew are CPR qualified & have AED.  This doesn't happen from RC phones (or cellphones).
 +
#* Power shed 3-4pm today, beam restoration likely 5pm+.
 +
#* MCC planning to raise the current to Hall C.
 
#Issues
 
#Issues
 
#* [https://logbooks.jlab.org/entry/4006157 DAQ crash ROCTRIG2 - called Sergey]
 
#* [https://logbooks.jlab.org/entry/4006157 DAQ crash ROCTRIG2 - called Sergey]
Line 33: Line 36:
 
#* (U1-10-TOP MPOD crate)
 
#* (U1-10-TOP MPOD crate)
 
#Plans
 
#Plans
#*No beam from 6:30am until sometime after 3pm, likely 5pm+ due to power shedding.
+
#*No beam until swing.
 
#*Walk-through at 11am
 
#*Walk-through at 11am
#*Site exit opposite Tech Center closed most of the day.
+
#*Site exit opposite Tech Center closed most of the day - need to exit by resfac or Lidl.  
 
#Commissioning steps temporarily postponed:
 
#Commissioning steps temporarily postponed:
 
#*Flux optimization/Act .Col. calibration
 
#*Flux optimization/Act .Col. calibration
 
#*Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.
 
#*Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.

Revision as of 08:19, 23 June 2022

↑ Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Thursday June 23

  1. Last 24h:
  2. Shift Summaries
  3. Reports
    • From MCC: Reminder that 911 from lab phone is forwarded to normal 911 and also automatically informs the crew chief, guard shack, etc that there's an emergency, crew are CPR qualified & have AED. This doesn't happen from RC phones (or cellphones).
    • Power shed 3-4pm today, beam restoration likely 5pm+.
    • MCC planning to raise the current to Hall C.
  4. Issues
  5. Plans
    • No beam until swing.
    • Walk-through at 11am
    • Site exit opposite Tech Center closed most of the day - need to exit by resfac or Lidl.
  6. Commissioning steps temporarily postponed:
    • Flux optimization/Act .Col. calibration
    • Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.