Difference between revisions of "Run Planning Meeting Notes, December 16 - December 22, 2021"

From GlueXWiki
Jump to: navigation, search
(Friday December 17)
(Friday December 17)
Line 4: Line 4:
 
#* Smooth production on LD<sub>2</sub> at 140 nA, 0/90 para and perp. Took one amorphous run (90578).  
 
#* Smooth production on LD<sub>2</sub> at 140 nA, 0/90 para and perp. Took one amorphous run (90578).  
 
#Issues
 
#Issues
#*  
+
#* Target's Labview monitoring hanging: [https://logbooks.jlab.org/entry/3964236 C. Carlin rebooted target control computer. Caused a 1K drop in temperature (happened during run 90579).] No Labview problem since then.
 +
#*[https://halldweb.jlab.org/hdops/wiki/index.php/On_Shift:_Current_Issues On Shift: Current Issues page]
 
#Plans
 
#Plans
 
#* Continue running on LD<sub>2</sub> at 140 nA, 0/90 para and perp until 1:45pm (if empty target run is needed) or 3:45pm (if not).
 
#* Continue running on LD<sub>2</sub> at 140 nA, 0/90 para and perp until 1:45pm (if empty target run is needed) or 3:45pm (if not).

Revision as of 07:55, 17 December 2021

Friday December 17

  1. Last 24h:
    • Smooth production on LD2 at 140 nA, 0/90 para and perp. Took one amorphous run (90578).
  2. Issues
  3. Plans
    • Continue running on LD2 at 140 nA, 0/90 para and perp until 1:45pm (if empty target run is needed) or 3:45pm (if not).
    • Target change LD2 → L4He:
      • If an empty target run is desirable, start emptying the target and turn off pulse refrigerator at 1:45pm (assuming a 2h run). Otherwise, start emptying/pulse refr. off at 3:45pm.
      • 2pm-4pm: 2h empty target run?
      • 4pm. Ask MCC for beam off and Rapid Access. Chris Carlin goes in the Hall to start switching gas. Solenoid will stay on: be aware of magnetic field fringes.
      • Between 5pm and 6pm: Chris is done switching gas. End of rapid access.
      • Ask for beam. (No need for beam restoration check as the beam down time is small): while the target cools down (about 3h process). A. Somov will take test data.
    • around 9pm: target is cold. Start running on L4He at 150 nA, 0/90 para and perp.

Thursday December 16

  1. Last 24h:
    • Smooth production on LD2 at 140 nA, 0/90 para and perp. Interrupted only by search for better spot on diamond (~1h see below) and ~1h of RF-related down time.
    • Spectra from A. Somov.
  2. Issues
  3. Plans
    • Continue running on LD2 at 140 nA, 0/90 para and perp. Do one amorphous run today.
    • Discussion on possible target change to L4He.
    • Status of possible CPP test.