=Tuesday December 21=
 +
#Last 24h:
 +
#*~6h of production on <sup>4</sup>He (150 nA, 0/90 perp only: para was too degraded.)
 +
#*3h35 (3:40am-7:15am) empty target data taking.
 +
#*[https://logbooks.jlab.org/entry/3966712 trigger tests in raw data mode and CPP trigger test.]
 +
#Issues
 +
#* Target OVC vacuum.
 +
#* [https://logbooks.jlab.org/entry/3966702 Target temperature increases]
 +
#* [https://logbooks.jlab.org/entry/3966864 Transmission rate decreased by 5%]
 +
#Summaries
 +
#*[https://logbooks.jlab.org/entry/3966910 Electron beam energy during the SRC-CT run.]
 +
#*[https://logbooks.jlab.org/entry/3966912 Normalized rates for SCR-CT Fall 2021 run]
 +
#Plans
 +
#*End of Fall 2021 run. Hall shut down tasks:
 +
#**Secure beam line:
 +
#***All radiators retracted.
 +
#***Collimator in blocking position.
 +
#***PS and sweeping magnets off.
 +
#**Solenoid ramp down.
 +
#**Target will already be empty. Keep PTR on since the target group might do some investigation of the vacuum event.
 +
#**High and low Voltages off.
 +
#**Crates will be kept on.
 +
 +
=Monday December 20=
 +
#Last 24h:
 +
#* ~4h of production on <sup>4</sup>He (150 nA, 0/90 para and perp).
 +
#* 2 long down times: ~5h between Sunday 9am-13:45 (multiple causes. Mains ones: Bulk power supply and 1L04 RF). Monday: 1am-ongoing (IL05 RF).
 +
#* 2h on Amorphous radiator (runs 90631, 90632).
 +
#* [https://logbooks.jlab.org/entry/3966194 CPP trigger tests (~5h)]
 +
#Issues
 +
#*[https://logbooks.jlab.org/entry/3965971 Target pressure event] due to large [https://logbooks.jlab.org/files/2021/12/3965971/screen.jpg vacuum spike] in the Outer Vacuum Can (OVC). [https://logbooks.jlab.org/entry/3966001 No incidence on data taking.] (Most of the event unfolded during beam down time in any case.)
 +
#* [https://logbooks.jlab.org/entry/3966112 Target status and comments from Chris C. and Hovanes]
 +
#* [https://logbooks.jlab.org/entry/3966302 Target status (7pm)]
 +
#* [https://logbooks.jlab.org/entry/3966090 Diamond degradation]
 +
#Plans
 +
#*Production on <sup>4</sup>He (150 nA, 0/90 para and perp) until Tuesday 7am.
 +
#*3h trigger tests in raw data mode.
 +
#*1h CPP trigger test.
 +
#* Finish run period with ~3h Empty target run, from 3:30am (12/21/2021) to shutdown around 7am. (This will permit to check if the target event above has made ice to accumulate on the target cell).
 +
#*No analysis meeting today
 +
 +
=Sunday December 19=
 +
#Last 24h:
 +
#* Smooth data collection on <sup>4</sup>He (150 nA, 0/90 para and perp).
 +
#Issues
 +
#*Nothing special.
 +
#Plans
 +
#*Production on <sup>4</sup>He (150 nA, 0/90 para and perp).
 +
#*Amorphous run Sunday morning.
 +
#*CPP trigger tests (During A. Somov shift in the afternoon.)
 +
 +
=Saturday December 18=
 +
#Last 24h:
 +
#* Collected data on LD<sub>2</sub> at 140 nA, 0/90 para and perp until 14:10. Then started empty target run, as planned before switching to <sup>4</sup>He.
 +
#* 1h empty target run (run 90602, Diamond 0/90, para, 150 nA).
 +
#* [https://logbooks.jlab.org/entry/3965061 Access for target gas change (C. Carlin).]
 +
#** Sasha and Vlad took advantage of the access to [https://logbooks.jlab.org/entry/3965001 re-position the calorimeter prototype].
 +
#** During the <sup>4</sup>He cool down, Sasha used the beam for PS background test (0/90 PARA)
 +
#* Around 23:00 (Friday) <sup>4</sup>He reached nominal temperature. ⇒ Ready for production but the beam was unavailable. [https://logbooks.jlab.org/entry/3965138 About 1:50am]: Started production on <sup>4</sup>He (150 nA, 0/90 para and perp).
 +
#Issues
 +
#* [https://logbooks.jlab.org/comment/36529#comment-36529 Target's boiler heater malfunctioned. Access was necessary (C. Carlin).] It reduced to empty target run from 2h to 1h.
 +
#* [https://logbooks.jlab.org/entry/3965181 Rootspy failing to connect]. [https://logbooks.jlab.org/entry/3965194 Issue solved by Alex. A.]
 +
#Plans
 +
#*Production on <sup>4</sup>He (150 nA, 0/90 para and perp).
 +
 +
=Friday December 17=
 +
 +
#Last 24h:
 +
#* Smooth production on LD<sub>2</sub> at 140 nA, 0/90 para and perp. 3 beam interruptions (1h+0.3h+2.5h). Took one amorphous run (90578).
 +
#Issues
 +
#* Target's Labview monitoring hanging: [https://logbooks.jlab.org/entry/3964236 C. Carlin rebooted target control computer. Caused a 2.5K drop in temperature (happened during run 90579).] No Labview problem since then.
 +
#* [https://logbooks.jlab.org/entry/3964773 Target LD2 nominal temperature before reboot was 1.3K higher than nominal temperature after reboot.]
 +
#* [https://logbooks.jlab.org/entry/3964750 Current lock]. Consequence of 2.5h accelerator down due to PSS fault. [https://accweb.acc.jlab.org/presenter/presentation/15236#3 Fixed]
 +
#* Diamond degradation.
 +
#*[https://halldweb.jlab.org/hdops/wiki/index.php/On_Shift:_Current_Issues On Shift: Current Issues page]
 +
#Plans
 +
#* Continue running on LD<sub>2</sub> at 140 nA, 0/90 para and perp until 1:45pm (if empty target run is needed) or 3:45pm (if not).
 +
#* Target change LD<sub>2</sub> → <sup>4</sup>He:
 +
#** If an empty target run is desirable, start emptying the target and turn off pulse refrigerator at 1:45pm (assuming a 2h run). Otherwise, start emptying/pulse refr. off at 3:45pm.
 +
#** 2pm-4pm: 2h empty target run?
 +
#** 4pm. Ask MCC for beam off and Rapid Access. Chris Carlin goes in the Hall to start switching gas. <font color="red">'''Solenoid will stay on: be aware of magnetic field fringes'''</font>. 
 +
#** Between 5pm and 6pm: Chris is done switching gas. End of rapid access.
 +
#** Ask for beam. (No need for beam restoration check as the beam down time is small): while the target cools down (about 3h process). A. Somov will take test data.
 +
#* around 9pm: target is cold. Start running on L<sup>4</sup>He at 150 nA, 0/90 para and perp.
 +
 
=Thursday December 16=
 
=Thursday December 16=
  
 
#Last 24h:
 
#Last 24h:
#*  
+
#* Smooth production on LD<sub>2</sub> at 140 nA, 0/90 para and perp. Interrupted only by search for better spot on diamond (~1h see below) and ~1h of RF-related down time.
#*  
+
#* [https://logbooks.jlab.org/entry/3964150 Spectra from A. Somov.]
#*
+
#*
+
 
#Issues
 
#Issues
 
#* JD70-105 degradation: [https://logbooks.jlab.org/entry/3963658 Hovanes tried to find a new location that improved the 0/90 para and 45/135 para/perp coherent peaks, but to no avail.]  
 
#* JD70-105 degradation: [https://logbooks.jlab.org/entry/3963658 Hovanes tried to find a new location that improved the 0/90 para and 45/135 para/perp coherent peaks, but to no avail.]  
 +
#* Target lost the Labview readout twice last night ([https://logbooks.jlab.org/entry/3963985 2:20am] and [https://logbooks.jlab.org/entry/3964080 5:50am]). Chris Carlin came the first time and [https://logbooks.jlab.org/entry/3964024 fixed it]. The second time, we fixed it following his instruction and [https://logbooks.jlab.org/entry/3964155 it worked].
 +
#* Rates are ~10% lower compared to previous LD<sub>2</sub> data taking period, see [https://halldweb.jlab.org/wiki/images/a/a3/Rate.png here]. Part of it is lower transmission but even accounting for this, normalized rates remains 6% lower (see trigger/PS, black disk symbols,  [https://halldweb.jlab.org/wiki/images/d/da/Rates_ratios.png here]). The comparison between the time-evolution of the Trigger/PS rates for diamond and amorphous radiators shows that the (non-transmission) drop is due to the diamond deterioration rather than detector deterioration. 
 
#Plans
 
#Plans
#* Continue running on LD<sub>2</sub> at 140 nA, 0/90 para and perp.
+
#* Continue running on LD<sub>2</sub> at 140 nA, 0/90 para and perp. Do one amorphous run today.
 
#* Discussion on possible target change to L<sup>4</sup>He.  
 
#* Discussion on possible target change to L<sup>4</sup>He.  
 
#* Status of possible CPP test.
 
#* Status of possible CPP test.

Latest revision as of 11:55, 21 December 2021

Tuesday December 21

  1. Last 24h:
  2. Issues
  3. Summaries
  4. Plans
    • End of Fall 2021 run. Hall shut down tasks:
      • Secure beam line:
        • All radiators retracted.
        • Collimator in blocking position.
        • PS and sweeping magnets off.
      • Solenoid ramp down.
      • Target will already be empty. Keep PTR on since the target group might do some investigation of the vacuum event.
      • High and low Voltages off.
      • Crates will be kept on.

Monday December 20

  1. Last 24h:
    • ~4h of production on 4He (150 nA, 0/90 para and perp).
    • 2 long down times: ~5h between Sunday 9am-13:45 (multiple causes. Mains ones: Bulk power supply and 1L04 RF). Monday: 1am-ongoing (IL05 RF).
    • 2h on Amorphous radiator (runs 90631, 90632).
    • CPP trigger tests (~5h)
  2. Issues
  3. Plans
    • Production on 4He (150 nA, 0/90 para and perp) until Tuesday 7am.
    • 3h trigger tests in raw data mode.
    • 1h CPP trigger test.
    • Finish run period with ~3h Empty target run, from 3:30am (12/21/2021) to shutdown around 7am. (This will permit to check if the target event above has made ice to accumulate on the target cell).
    • No analysis meeting today

Sunday December 19

  1. Last 24h:
    • Smooth data collection on 4He (150 nA, 0/90 para and perp).
  2. Issues
    • Nothing special.
  3. Plans
    • Production on 4He (150 nA, 0/90 para and perp).
    • Amorphous run Sunday morning.
    • CPP trigger tests (During A. Somov shift in the afternoon.)

Saturday December 18

  1. Last 24h:
    • Collected data on LD2 at 140 nA, 0/90 para and perp until 14:10. Then started empty target run, as planned before switching to 4He.
    • 1h empty target run (run 90602, Diamond 0/90, para, 150 nA).
    • Access for target gas change (C. Carlin).
    • Around 23:00 (Friday) 4He reached nominal temperature. ⇒ Ready for production but the beam was unavailable. About 1:50am: Started production on 4He (150 nA, 0/90 para and perp).
  2. Issues
  3. Plans
    • Production on 4He (150 nA, 0/90 para and perp).

Friday December 17

  1. Last 24h:
    • Smooth production on LD2 at 140 nA, 0/90 para and perp. 3 beam interruptions (1h+0.3h+2.5h). Took one amorphous run (90578).
  2. Issues
  3. Plans
    • Continue running on LD2 at 140 nA, 0/90 para and perp until 1:45pm (if empty target run is needed) or 3:45pm (if not).
    • Target change LD24He:
      • If an empty target run is desirable, start emptying the target and turn off pulse refrigerator at 1:45pm (assuming a 2h run). Otherwise, start emptying/pulse refr. off at 3:45pm.
      • 2pm-4pm: 2h empty target run?
      • 4pm. Ask MCC for beam off and Rapid Access. Chris Carlin goes in the Hall to start switching gas. Solenoid will stay on: be aware of magnetic field fringes.
      • Between 5pm and 6pm: Chris is done switching gas. End of rapid access.
      • Ask for beam. (No need for beam restoration check as the beam down time is small): while the target cools down (about 3h process). A. Somov will take test data.
    • around 9pm: target is cold. Start running on L4He at 150 nA, 0/90 para and perp.

Thursday December 16

  1. Last 24h:
    • Smooth production on LD2 at 140 nA, 0/90 para and perp. Interrupted only by search for better spot on diamond (~1h see below) and ~1h of RF-related down time.
    • Spectra from A. Somov.
  2. Issues
  3. Plans
    • Continue running on LD2 at 140 nA, 0/90 para and perp. Do one amorphous run today.
    • Discussion on possible target change to L4He.
    • Status of possible CPP test.