(Saturday December 18)
(Saturday December 18)
Line 2: Line 2:
 
#Last 24h:
 
#Last 24h:
 
#* Collected data on LD<sub>2</sub> at 140 nA, 0/90 para and perp until 14:10. Then started empty target run, as planned before switching to <sup>4</sup>He.
 
#* Collected data on LD<sub>2</sub> at 140 nA, 0/90 para and perp until 14:10. Then started empty target run, as planned before switching to <sup>4</sup>He.
#* 1h empty target run (Diamond 0/90, para, 150 nA).
+
#* 1h empty target run (run 90602, Diamond 0/90, para, 150 nA).
#* Access for target gas change (C. Carlin).
+
#* [https://logbooks.jlab.org/entry/3965061 Access for target gas change (C. Carlin).]
 
#** Sasha and Vlad took advantage of the access to [https://logbooks.jlab.org/entry/3965001 re-position the calorimeter prototype].
 
#** Sasha and Vlad took advantage of the access to [https://logbooks.jlab.org/entry/3965001 re-position the calorimeter prototype].
#* Ready for production around 23:00 (Friday) but beam was unavailable. About 2am: Started production on <sup>4</sup>He (150 nA, 0/90 para and perp).
+
#** During the <sup>4</sup>He cool down, Sasha used the beam for PS background test (0/90 PARA)
 +
#* Around 23:00 (Friday) <sup>4</sup>He reached nominal temperature. ⇒ Ready for production but the beam was unavailable. [https://logbooks.jlab.org/entry/3965138 About 1:50am]: Started production on <sup>4</sup>He (150 nA, 0/90 para and perp).
 
#Issues
 
#Issues
#* Target's boiler heater malfunctioned. Access was necessary (C. Carlin). It reduced to empty target run from 2h/1h.
+
#* [https://logbooks.jlab.org/comment/36529#comment-36529 Target's boiler heater malfunctioned. Access was necessary (C. Carlin).] It reduced to empty target run from 2h to 1h.
 +
#* [https://logbooks.jlab.org/entry/3965181 Rootspy failing to connect]. [https://logbooks.jlab.org/entry/3965194 Issue solved by Alex. A.]
 
#Plans
 
#Plans
 
#*Production on <sup>4</sup>He (150 nA, 0/90 para and perp).
 
#*Production on <sup>4</sup>He (150 nA, 0/90 para and perp).

Revision as of 11:24, 18 December 2021

Saturday December 18

  1. Last 24h:
    • Collected data on LD2 at 140 nA, 0/90 para and perp until 14:10. Then started empty target run, as planned before switching to 4He.
    • 1h empty target run (run 90602, Diamond 0/90, para, 150 nA).
    • Access for target gas change (C. Carlin).
    • Around 23:00 (Friday) 4He reached nominal temperature. ⇒ Ready for production but the beam was unavailable. About 1:50am: Started production on 4He (150 nA, 0/90 para and perp).
  2. Issues
  3. Plans
    • Production on 4He (150 nA, 0/90 para and perp).

Friday December 17

  1. Last 24h:
    • Smooth production on LD2 at 140 nA, 0/90 para and perp. 3 beam interruptions (1h+0.3h+2.5h). Took one amorphous run (90578).
  2. Issues
  3. Plans
    • Continue running on LD2 at 140 nA, 0/90 para and perp until 1:45pm (if empty target run is needed) or 3:45pm (if not).
    • Target change LD24He:
      • If an empty target run is desirable, start emptying the target and turn off pulse refrigerator at 1:45pm (assuming a 2h run). Otherwise, start emptying/pulse refr. off at 3:45pm.
      • 2pm-4pm: 2h empty target run?
      • 4pm. Ask MCC for beam off and Rapid Access. Chris Carlin goes in the Hall to start switching gas. Solenoid will stay on: be aware of magnetic field fringes.
      • Between 5pm and 6pm: Chris is done switching gas. End of rapid access.
      • Ask for beam. (No need for beam restoration check as the beam down time is small): while the target cools down (about 3h process). A. Somov will take test data.
    • around 9pm: target is cold. Start running on L4He at 150 nA, 0/90 para and perp.

Thursday December 16

  1. Last 24h:
    • Smooth production on LD2 at 140 nA, 0/90 para and perp. Interrupted only by search for better spot on diamond (~1h see below) and ~1h of RF-related down time.
    • Spectra from A. Somov.
  2. Issues
  3. Plans
    • Continue running on LD2 at 140 nA, 0/90 para and perp. Do one amorphous run today.
    • Discussion on possible target change to L4He.
    • Status of possible CPP test.