(Created page with "== Current Situation in HallD == * Slow control is EPICS viewed with CSS (control studio system?) * Web based epics [https://epicsweb.jlab.org/wmenu/#HallDMenu-page viewer sup...")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Current Situation in HallD ==
+
* Current Situation in HallD
* Slow control is EPICS viewed with CSS (control studio system?)
+
** Slow control is EPICS viewed with CSS (control studio system?)
* Web based epics [https://epicsweb.jlab.org/wmenu/#HallDMenu-page viewer support]
+
** Web based epics [https://epicsweb.jlab.org/wmenu/#HallDMenu-page viewer support]
 +
** vnc server run on gluon47 and gluon48
 +
** Bluejeans session running on pc box (ubuntu) on the floor, with speakers, mic and webcam.
 +
** Data monitoring on gluon machines: Monitoring plots, HYDRA, CSS, HOSS, ...
 +
** [https://halldweb.jlab.org/hdops/wiki/index.php/Main_Page HallD ops wiki]
 +
**
 +
* What do we want remote shift person to do??? (this is the main question and will dictate the requirements)
 +
*# watch online monitoring plots: rootspy
 +
*# watch hydra results
 +
*# watch coherent peak location
 +
*# ......
 +
*# ......
 +
* Based on these shift duties
 +
** Define hardware/software requirements (onsite/offsite)
 +
** Write up Shift-Duties/Howto's for remote shift person

Latest revision as of 10:00, 19 March 2021

  • Current Situation in HallD
    • Slow control is EPICS viewed with CSS (control studio system?)
    • Web based epics viewer support
    • vnc server run on gluon47 and gluon48
    • Bluejeans session running on pc box (ubuntu) on the floor, with speakers, mic and webcam.
    • Data monitoring on gluon machines: Monitoring plots, HYDRA, CSS, HOSS, ...
    • HallD ops wiki
  • What do we want remote shift person to do??? (this is the main question and will dictate the requirements)
    1. watch online monitoring plots: rootspy
    2. watch hydra results
    3. watch coherent peak location
    4. ......
    5. ......
  • Based on these shift duties
    • Define hardware/software requirements (onsite/offsite)
    • Write up Shift-Duties/Howto's for remote shift person