Difference between revisions of "Photon beam pipe"
From GlueXWiki
Line 20: | Line 20: | ||
---- | ---- | ||
− | + | ==Photon beamline between tagger and West Wall == | |
Sketch of the photon beamline between the tagger magnet and the West wall of the | Sketch of the photon beamline between the tagger magnet and the West wall of the | ||
Line 30: | Line 30: | ||
---- | ---- | ||
− | + | ==Machine Group Songsheet for the Tagger Hall== | |
The plans by the accelerator are summarized in their song-sheet. It can be found here | The plans by the accelerator are summarized in their song-sheet. It can be found here |
Revision as of 13:27, 20 July 2008
Contents
Machine interface Documents
Machine interface document draft 4. Draft sent to machine for comment. ICD_Accelerator-HallD_04.doc
Machine interface document draft 3 ICD_Accelerator-HallD_03.doc
Collimator Cave
- Conceptual design of shielding plan from Connecticut (5/2006)
- Civil design produced by engineering firm for JLab (10/2007)
Collimator Cave Layout Jul 18, 2008 - July 18, 2008 Collimator Cave Isometric Jul 18, 2008 - July 18, 2008
Photon beamline between tagger and West Wall
Sketch of the photon beamline between the tagger magnet and the West wall of the tagger hall.
File:Beamline-BSize Layout.TIF
Machine Group Songsheet for the Tagger Hall
The plans by the accelerator are summarized in their song-sheet. It can be found here
Tagger hall songsheet version March 26 2008 File:12GeVSSAcc42 songsheet.tif