Line 20: Line 20:
 
----
 
----
  
=== Photon beamline between tagger and West Wall ===
+
==Photon beamline between tagger and West Wall ==
  
 
Sketch of the photon beamline between the tagger magnet and the West wall of the  
 
Sketch of the photon beamline between the tagger magnet and the West wall of the  
Line 30: Line 30:
 
----
 
----
  
===Machine Group Songsheet for the Tagger Hall===
+
==Machine Group Songsheet for the Tagger Hall==
  
 
The plans by the accelerator are summarized in their song-sheet. It can be found here
 
The plans by the accelerator are summarized in their song-sheet. It can be found here

Revision as of 13:27, 20 July 2008

Machine interface Documents

Machine interface document draft 4. Draft sent to machine for comment. ICD_Accelerator-HallD_04.doc


Machine interface document draft 3 ICD_Accelerator-HallD_03.doc


Collimator Cave

  • Conceptual design of shielding plan from Connecticut (5/2006)
  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave Layout Jul 18, 2008 - July 18, 2008 Collimator Cave Isometric Jul 18, 2008 - July 18, 2008


Photon beamline between tagger and West Wall

Sketch of the photon beamline between the tagger magnet and the West wall of the tagger hall.

File:Beamline-BSize Layout.TIF



Machine Group Songsheet for the Tagger Hall

The plans by the accelerator are summarized in their song-sheet. It can be found here

Tagger hall songsheet version March 26 2008 File:12GeVSSAcc42 songsheet.tif