Difference between revisions of "Photon beam pipe"
From GlueXWiki
Line 1: | Line 1: | ||
=== Machine interface Documents === | === Machine interface Documents === | ||
+ | |||
Machine interface document draft 4. Draft sent to machine for comment. | Machine interface document draft 4. Draft sent to machine for comment. | ||
[[Media:ICD_Accelerator-HallD_04.doc |ICD_Accelerator-HallD_04.doc]] | [[Media:ICD_Accelerator-HallD_04.doc |ICD_Accelerator-HallD_04.doc]] | ||
Line 9: | Line 10: | ||
---- | ---- | ||
+ | |||
+ | ==Collimator Cave== | ||
+ | |||
+ | * Conceptual design of shielding plan from Connecticut ''(5/2006)'' | ||
+ | * Civil design produced by engineering firm for JLab ''(10/2007)'' | ||
+ | [http://www.jlab.org/~whitey/Collimator/Gluex_collimator_layout.pdf Collimator Cave Layout Jul 18, 2008] - ''July 18, 2008'' | ||
+ | [http://www.jlab.org/~whitey/Collimator/Gluex_collimator_isometric.pdf Collimator Cave Isometric Jul 18, 2008] - ''July 18, 2008'' | ||
+ | |||
+ | ---- | ||
+ | |||
=== Photon beamline between tagger and West Wall === | === Photon beamline between tagger and West Wall === | ||
+ | |||
Sketch of the photon beamline between the tagger magnet and the West wall of the | Sketch of the photon beamline between the tagger magnet and the West wall of the | ||
tagger hall. | tagger hall. | ||
Line 17: | Line 29: | ||
---- | ---- | ||
+ | |||
===Machine Group Songsheet for the Tagger Hall=== | ===Machine Group Songsheet for the Tagger Hall=== | ||
+ | |||
The plans by the accelerator are summarized in their song-sheet. It can be found here | The plans by the accelerator are summarized in their song-sheet. It can be found here | ||
Revision as of 13:26, 20 July 2008
Contents
Machine interface Documents
Machine interface document draft 4. Draft sent to machine for comment. ICD_Accelerator-HallD_04.doc
Machine interface document draft 3 ICD_Accelerator-HallD_03.doc
Collimator Cave
- Conceptual design of shielding plan from Connecticut (5/2006)
- Civil design produced by engineering firm for JLab (10/2007)
Collimator Cave Layout Jul 18, 2008 - July 18, 2008 Collimator Cave Isometric Jul 18, 2008 - July 18, 2008
Photon beamline between tagger and West Wall
Sketch of the photon beamline between the tagger magnet and the West wall of the tagger hall.
File:Beamline-BSize Layout.TIF
Machine Group Songsheet for the Tagger Hall
The plans by the accelerator are summarized in their song-sheet. It can be found here
Tagger hall songsheet version March 26 2008 File:12GeVSSAcc42 songsheet.tif