(Agenda)
(Agenda)
Line 27: Line 27:
 
##Ion Chamber Procedures currently under review for release for use.
 
##Ion Chamber Procedures currently under review for release for use.
 
##Eugene/Curtis added as administrators for Hall D Operational Restrictions[http://opsweb.acc.jlab.org/internal/ops/ops_webpage/restrictions/ops_restrictions.html]
 
##Eugene/Curtis added as administrators for Hall D Operational Restrictions[http://opsweb.acc.jlab.org/internal/ops/ops_webpage/restrictions/ops_restrictions.html]
##System Experts requested to write test plans for nA BPM, FFB, and Active Collimator hardware commissioning  
+
##System Experts requested to write test plans for nA BPM, FFB, and Active Collimator hardware commissioning.
 +
##Cross Calibration Procedure for absolute current measurement desired?
 +
##Point of contact in Radcon for measurement test plan for fall? (George or Pavel perhaps?)
 
# Photon Commissioning Draft (Alexandre)
 
# Photon Commissioning Draft (Alexandre)
 
# Radiation monitors
 
# Radiation monitors

Revision as of 12:57, 23 July 2014

Organization

  • Time: 4 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Sasha says he will do this
  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Alexandre for Hall D)

Agenda

  1. Announcements
  2. Electron Commissioning (Todd/Mike)
    1. Hall D Beam Delivery Procedure heading to Rev. 10 with feedback received.
    2. Ion Chamber Procedures currently under review for release for use.
    3. Eugene/Curtis added as administrators for Hall D Operational Restrictions[1]
    4. System Experts requested to write test plans for nA BPM, FFB, and Active Collimator hardware commissioning.
    5. Cross Calibration Procedure for absolute current measurement desired?
    6. Point of contact in Radcon for measurement test plan for fall? (George or Pavel perhaps?)
  3. Photon Commissioning Draft (Alexandre)
  4. Radiation monitors
  5. Aug 8 Review:
  6. Other business

Minutes

Attending:'