Difference between revisions of "Photon Beam Commissioning Discussion July 23, 2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 22: Line 22:
  
 
== Agenda ==
 
== Agenda ==
 +
# Announcements
 +
# Electron Commissioning (Todd/Mike)
 +
# Photon Commissioning Draft (Alexandre)
 +
# Radiation monitors
 +
# Aug 8 Review:
 +
#* [http://www.jlab.org/Hall-D/halld_secure/reviews/PhotonBeamCommissioning_Internal_Aug2014/ Photon Beam Commissioning Review Page]
 +
# Other business
 +
 +
== Minutes ==
 +
 +
''Attending:
 +
 
# Announcements
 
# Announcements
 
# Electron Commissioning (Todd/Mike)
 
# Electron Commissioning (Todd/Mike)
Line 42: Line 54:
 
#* [http://www.jlab.org/Hall-D/halld_secure/reviews/PhotonBeamCommissioning_Internal_Aug2014/ Photon Beam Commissioning Review Page]
 
#* [http://www.jlab.org/Hall-D/halld_secure/reviews/PhotonBeamCommissioning_Internal_Aug2014/ Photon Beam Commissioning Review Page]
 
# Other business
 
# Other business
 
== Minutes ==
 
 
''Attending:'
 

Revision as of 17:38, 23 July 2014

Organization

  • Time: 4 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Sasha says he will do this
  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Alexandre for Hall D)

Agenda

  1. Announcements
  2. Electron Commissioning (Todd/Mike)
  3. Photon Commissioning Draft (Alexandre)
  4. Radiation monitors
  5. Aug 8 Review:
  6. Other business

Minutes

Attending:

  1. Announcements
  2. Electron Commissioning (Todd/Mike)
    • The Hall D Beam Delivery Procedure is heading toward Rev. 10 with the feedback which was received.
    • Ion Chamber Procedures are currently under review for release and use.
    • Eugene/Curtis have been added as administrators for Hall D's Operational Restrictions[1]
    • System Experts have been requested to write test plans for hardware commissioning of the nA BPMs, FFB system, and the Active Collimator.
    • Is a Cross Calibration Procedure for absolute current measurement desired? (Between Faraday Cup 2 in the Injector and the Hall BCM)
    • Need to identify the appropriate point of contact in Radcon to write the measurement test plan for fall (George K. or Pavel perhaps?)
    • Regarding minimum deliverable current (open question from last time):
Stripline BPM Resolutions ≥ 30nA 100um resolution < 30nA resolution suffers(position noisy barring additional filtering) 3nA yields expected resolution ≈ 300 µm
  1. Photon Commissioning Draft (Alexandre)
  2. Radiation monitors
  3. Aug 8 Review:
  4. Other business