Difference between revisions of "Photon Beam Commissioning Discussion July 16, 2014"

From GlueXWiki
Jump to: navigation, search
(References)
(References)
Line 11: Line 11:
  
 
* [https://hdops.jlab.org/wiki/index.php/Hall_D_Commissioning Hall D Commissioning Pages]
 
* [https://hdops.jlab.org/wiki/index.php/Hall_D_Commissioning Hall D Commissioning Pages]
* [[Media:HallD beam delivery proc 1b8.pdf | DRAFT Accelerator Hall D Beam Commissioning Procedures]]
+
* [[Media:HallD_beam_delivery_proc_1b9.pdf‎ | DRAFT Accelerator Hall D Beam Delivery Procedures(V.1b9)]]
* [[Media:Hall_D_ion_chamber_calibration_proc_1b2.pdf‎ | Draft Accelerator Hall D Ion Chamber Calibration Procedure]]
+
* [[Media:Tagger_operation_procedure.docx | DRAFT Accelerator Tagger Magnet Operation Procedures(V. 0)]]
 +
* [[Media:Hall_D_ion_chamber_functional_test_proc_1b3.pdf‎‎ | DRAFT Accelerator Hall D Ion Chamber Functional Test Procedure(V.1b3)]]
 +
* [[Media:Hall_D_ion_chamber_calibration_proc_1b2.pdf‎ | DRAFT Accelerator Hall D Ion Chamber Calibration Procedure(V.1b2)]]
  
 
== Action Items ==
 
== Action Items ==

Revision as of 13:54, 16 July 2014

Organization

  • Time: 4 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Send link to accelerator commissioning procedure (Mike)
  • Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard)
  • Todd will provide the magnetic field of the quadrupole immediately upstream of the tagger magnet (Todd)
  • Check that radiator set for commissioning is available (Alexandre, Hovanes)
  • Check that RadCon detectors are available/installed in tagger hall and hall D (Alexandre)
  • Check that 'rapid access system' is being implemented in Hall D (Alexandre)
  • Organize preparations for review (Elton).

Agenda

  1. Announcements
  2. Electron Commissioning (Todd/Mike)
  3. Photon Commissioning Draft (Eugene)
  4. Goals for Aug 8 Review
  5. Other business

Minutes

  • Attending: