Difference between revisions of "Photon Beam Commissioning Discussion July 16, 2014"

From GlueXWiki
Jump to: navigation, search
(Action Items)
(Action Items)
Line 19: Line 19:
  
 
* <strike> Send link to accelerator commissioning procedure (Mike) </strike>
 
* <strike> Send link to accelerator commissioning procedure (Mike) </strike>
* Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Sasha)
+
* Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Sasha says he will do this
* Todd will provide the magnetic field of the quadrupole immediately upstream of the tagger magnet (Todd)
+
* <strike> Todd will provide the magnetic field of the quadrupole immediately upstream of the tagger magnet (Todd) </strike> Todd has requested the information and will pass it on when he gets it
* Check that radiator set for commissioning is available (Alexandre, Hovanes)
+
* <strike> Check that radiator set for commissioning is available (Alexandre, Hovanes) </strike> Material for 2x10^-4 available, Alexandre will order the 1x10^-4 material
* Check that RadCon detectors are available/installed in tagger hall and hall D (Alexandre)
+
* <strike> Check that RadCon detectors are available/installed in tagger hall and hall D (Alexandre) </strike> Draft plan with Radcon is in place and will be pursued
* Check that 'rapid access system' is being implemented in Hall D (Alexandre)
+
* <strike> Check that 'rapid access system' is being implemented in Hall D (Alexandre) </strike> Draft plan with RadCon is in place and will be pursued.
* Organize preparations for review (Elton).
+
* <strike> Organize preparations for review (Elton). </strike> See notes
  
 
== Agenda ==
 
== Agenda ==

Revision as of 18:01, 16 July 2014

Organization

  • Time: 4 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Send link to accelerator commissioning procedure (Mike)
  • Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Sasha says he will do this
  • Todd will provide the magnetic field of the quadrupole immediately upstream of the tagger magnet (Todd) Todd has requested the information and will pass it on when he gets it
  • Check that radiator set for commissioning is available (Alexandre, Hovanes) Material for 2x10^-4 available, Alexandre will order the 1x10^-4 material
  • Check that RadCon detectors are available/installed in tagger hall and hall D (Alexandre) Draft plan with Radcon is in place and will be pursued
  • Check that 'rapid access system' is being implemented in Hall D (Alexandre) Draft plan with RadCon is in place and will be pursued.
  • Organize preparations for review (Elton). See notes

Agenda

  1. Announcements
  2. Electron Commissioning (Todd/Mike)
  3. Photon Commissioning Draft (Alexandre)
  4. Aug 8 Review: Location CC L102
    • Reviewers: Mike Spata, Brian Freeman, Stepan Stepanyan
    • Charge/Schedule (Elton/Eugene)
    • Materials: Accelerator Procedures (Mike); Plan for photon beam commissioning (Alexandre)
    • Talks: Overview/Goals/Charge (Eugene); Photon beam properties (Richard); Electron beam commissioning (Michael); Photon beam commissioning (Alexandre)
  5. Other business

Minutes

  • Attending: