Line 30: Line 30:
 
# Electron Commissioning (Todd/Mike)
 
# Electron Commissioning (Todd/Mike)
 
# Photon Commissioning Draft (Eugene)
 
# Photon Commissioning Draft (Eugene)
# Goals for Aug 8 Review
+
# Aug 8 Review: Location CC L102
 +
#* Reviewers: Mike Spata, Brian Freeman, Stepan Stepanyan
 +
#* Materials: Accelerator Procedures (Mike); Plan for photon beam commissioning (?)
 +
#* Talks: Photon beam properties (Richard); Electron beam commissioning (Todd); Photon beam commissioning (?)
 
# Other business
 
# Other business
  

Revision as of 15:39, 16 July 2014

Organization

  • Time: 4 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Send link to accelerator commissioning procedure (Mike)
  • Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard)
  • Todd will provide the magnetic field of the quadrupole immediately upstream of the tagger magnet (Todd)
  • Check that radiator set for commissioning is available (Alexandre, Hovanes)
  • Check that RadCon detectors are available/installed in tagger hall and hall D (Alexandre)
  • Check that 'rapid access system' is being implemented in Hall D (Alexandre)
  • Organize preparations for review (Elton).

Agenda

  1. Announcements
  2. Electron Commissioning (Todd/Mike)
  3. Photon Commissioning Draft (Eugene)
  4. Aug 8 Review: Location CC L102
    • Reviewers: Mike Spata, Brian Freeman, Stepan Stepanyan
    • Materials: Accelerator Procedures (Mike); Plan for photon beam commissioning (?)
    • Talks: Photon beam properties (Richard); Electron beam commissioning (Todd); Photon beam commissioning (?)
  5. Other business

Minutes

  • Attending: