Difference between revisions of "Photon Beam Commissioning Discussion Aug 13, 2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 20: Line 20:
 
== Agenda ==
 
== Agenda ==
 
# Announcements
 
# Announcements
# Aug 8 Review:
+
# Debrief Aug 8 Review:
 
#* [http://www.jlab.org/Hall-D/halld_secure/reviews/PhotonBeamCommissioning_Internal_Aug2014/ Photon Beam Commissioning Review Page]
 
#* [http://www.jlab.org/Hall-D/halld_secure/reviews/PhotonBeamCommissioning_Internal_Aug2014/ Photon Beam Commissioning Review Page]
 +
#* Comments / to-do-list for ARR
 +
#* ARR presentations
 
# [https://halldweb1.jlab.org/wiki/index.php/Specification_for_12_GeV_electron_beam_and_associated_instrumentation Electron Beam Specifications]  
 
# [https://halldweb1.jlab.org/wiki/index.php/Specification_for_12_GeV_electron_beam_and_associated_instrumentation Electron Beam Specifications]  
 
#* Need signed document?
 
#* Need signed document?

Revision as of 17:46, 8 August 2014

Organization

  • Time: 4 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Sasha defined geometry, Richard will add field map
    • Sasha needs to update geometry with girder.
    • Richard has not had time to add Dan's new field. For now use the old field.
  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D)
    • Need rates for profiler, start counter, ps

Agenda

  1. Announcements
  2. Debrief Aug 8 Review:
  3. Electron Beam Specifications
    • Need signed document?
    • Accelerator and Hall D Interface Document - needs to be finalized.
  4. Electron Commissioning (Todd/Mike)
  5. Photon Commissioning Draft (Alexandre)
  6. Radiation monitors and controls (Pavel)
  7. Other business

Minutes

Attending: