(Created page with "__TOC__ == Organization == * Time: 4 pm EST * Connecting: detailed instructions are here ** H.323 ip address: 199.48.152.152 ** web browse...")
 
(Action Items)
Line 17: Line 17:
 
* Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D)
 
* Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D)
 
** Need rates for profiler, start counter, ps
 
** Need rates for profiler, start counter, ps
* <strike> Prepare plan for placing the profiler monitor at collimator, target and beam dump (Alexandre) </strike> Alexandre talked to Tim about designing the necessary stands. Hovanes will order cables that can reach the end of the collimator hut.
 
* Material for review due July 29: draft of presentations and all pre-brief material
 
** Drafts have been uploaded. Pre-brief material will be passed to reviewers early next week. Talks should be made available for comments early in the week. Elton will post them at noon on Thu.
 
  
 
== Agenda ==
 
== Agenda ==

Revision as of 17:40, 8 August 2014

Organization

  • Time: 4 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Sasha defined geometry, Richard will add field map
    • Sasha needs to update geometry with girder.
    • Richard has not had time to add Dan's new field. For now use the old field.
  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D)
    • Need rates for profiler, start counter, ps

Agenda

  1. Announcements
  2. Electron Beam Specifications - Need to verify
  3. Electron Commissioning (Todd/Mike)
  4. Photon Commissioning Draft (Alexandre)
  5. Radiation monitors and controls (Pavel)
  6. Aug 8 Review:
  7. Other business

Minutes

Attending: