Difference between revisions of "OWG Meeting 28-Oct-2009"
From GlueXWiki
m |
m |
||
Line 26: | Line 26: | ||
1:30 PM Wed 11-Nov-2009 | 1:30 PM Wed 11-Nov-2009 | ||
+ | |||
+ | |||
+ | |||
+ | ==New Action Items from this Meeting== | ||
+ | |||
+ | |||
+ | |||
+ | =Minutes= | ||
+ | |||
+ | Attendees: Elliott W, Mark I, Chris, C, Ben R, Simon T, William G, Fernando B, Beni Z. | ||
Line 39: | Line 49: | ||
− | ''' | + | '''ASIC and SiPM Update''' |
Fernando gave an update on the ASIC preamp and SiPM efforts. See GlueX docs 1364 (ASIC) and 1370 (SiPM). | Fernando gave an update on the ASIC preamp and SiPM efforts. See GlueX docs 1364 (ASIC) and 1370 (SiPM). | ||
Line 56: | Line 66: | ||
* Carl Zorn will perform extensive tests on all 10 SiPM's. | * Carl Zorn will perform extensive tests on all 10 SiPM's. | ||
* Gain about 10**6, noise ok. | * Gain about 10**6, noise ok. | ||
− | |||
− | |||
− | + | '''Electronics Update''' | |
+ | Chris gave an update on the remaining electronics efforts. | ||
− | + | * All projects well defined and moving along according to schedule, manpower ok. | |
− | + | * Version 2 of TDC and ADC in progress. | |
− | + | * Work on global trigger boards (GTP, SSP) in progress. | |
− | + | * TS board will be worked on in the next fiscal year, DAQ group heavily involved. | |
+ | * Chris is working on early VXS crate procurement for all halls, order perhaps in Spring 2010. |
Revision as of 16:38, 28 October 2009
Contents
Agenda
This will be a short meeting as we have interviews at 2:30pm
- Announcements -
- Review of minutes from 30-Sep-2009 meeting
- Electronics update - Fernando (he has another meeting at 2pm)
- Report on SSP - Ben
- Other electronics and trigger status reports - Chris, Ben, Ed, Alex, Dave
Time/Location
1:30 PM Wed 28-Oct-2009 CC F326
Announcements
Next Meeting
1:30 PM Wed 11-Nov-2009
New Action Items from this Meeting
Minutes
Attendees: Elliott W, Mark I, Chris, C, Ben R, Simon T, William G, Fernando B, Beni Z.
SSP Board Design
Ben gave a brief overview of progress on SSP board design.
- Front panel includes NIM and differential inputs.
- 8 fiber transceivers per board.
- CLAS will use a different version of the board, one SSP per sector.
- Board layout is preliminary, all major components placed, minor ones not placed yet.
- Firmware has been simulated.
ASIC and SiPM Update
Fernando gave an update on the ASIC preamp and SiPM efforts. See GlueX docs 1364 (ASIC) and 1370 (SiPM).
- ASIC and board ready for production, all features included (incl. dual gain).
- Boards pass all tests, look very good.
- Have 40 new ASICS with correct wire bonding plus old ones with faulty bond.
- Need 2000 for final system.
- Hamamatsu has delivered 10 4x4 SiPM arrays (1.2 cm square), still waiting for SensL (deadline early Nov).
- Ceramic carrier, no cooling needed, but temperature stabilization needed.
- 81% coverage, SensL will be slightly less.
- 50 micron pixels.
- Initial testing very good, meets all specs, cost in our range.
- Large SiPM array capacitance is typically high, not much can be done about it.
- Get 13 ns risetime for 5 ns input, 76 ns width.
- Carl Zorn will perform extensive tests on all 10 SiPM's.
- Gain about 10**6, noise ok.
Electronics Update
Chris gave an update on the remaining electronics efforts.
- All projects well defined and moving along according to schedule, manpower ok.
- Version 2 of TDC and ADC in progress.
- Work on global trigger boards (GTP, SSP) in progress.
- TS board will be worked on in the next fiscal year, DAQ group heavily involved.
- Chris is working on early VXS crate procurement for all halls, order perhaps in Spring 2010.