November 25, 2019 DIRC

From GlueXWiki
Revision as of 07:14, 25 November 2019 by Jrsteven (Talk | contribs) (Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday November 25, 2019<br> 1:00 pm, EDT<br> Hall D Counting House <br> == Connection Using Bluejeans == # To join via Poly...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Meeting Information

GlueX DIRC Meeting
Monday November 25, 2019
1:00 pm, EDT
Hall D Counting House

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
  2. Installation complete!
    • Comparison of LED occupancy with and without water filled (Bill)
    • FPGA temperatures in EPICS and now give an alarm if they exceed 60 C.
  1. Survey's complete: initial values consistent with Spring 2019 surveys
  2. Readout/DAQ tests and issues (Justin, Bill, All)
    • Missing pixel
    • After mirror boxes are installed with new diffusers we'll retake LED data (maybe this afternoon for North OB)
  3. Spare electronics (Bill, Andrew)
  4. Fall 2019 Run Plan (All)
  5. Spring 2019 DIRC Commissioning Analysis (All)
    • Merged ROOT TTrees: /volatile/halld/home/jrsteven/RunPeriod-2019-01/recon/analysis_REST/ver01_pass00/merged/
    • Existing simulation samples (10M events of ρ and φ samples): producing ROOT TTrees now with additional information on truth-level extrapolated tracks.
      • /volatile/halld/home/gxproj7/dircsim-2019_01-ver00/gen_2pi/
      • /volatile/halld/home/gxproj7/dircsim-2019_01-ver00/gen_2k/
    • New simulation samples (100M events each): various job failures that Justin is still tracking down:

E*** Samples for both Spring 2019 (commissioning) and Fall 2019 (borosilicate mirrors) will be produced

    • Commissioning LUT analyses (All)
      • Cherenkov ring fit (Roman)
      • Commissioning Analyses Update (Ahmed)
    • Commissioning FastDIRC update (Yunjie)
  1. Software/simulations
    • FastDIRC geometry implementation and alignment work (Cris/Yunjie)
  2. Software overview and tasks (All)
  3. AOB