Difference between revisions of "Minutes-6-23-2016"

From GlueXWiki
Jump to: navigation, search
Line 21: Line 21:
 
#** +2kV on sense wires, -500V on field wires, -1.4kV on the upstream cathode, downstream cathode (with strips) on ground [http://www.jlab.org/Hall-D/detector/trd/TRD_Garfield_NO_sc.png Garfield field/drift time simulations]
 
#** +2kV on sense wires, -500V on field wires, -1.4kV on the upstream cathode, downstream cathode (with strips) on ground [http://www.jlab.org/Hall-D/detector/trd/TRD_Garfield_NO_sc.png Garfield field/drift time simulations]
 
#** Adding additional cathode separates the drift and amplification volume and allows to set independently drift velocity and gas gain [http://www.jlab.org/Hall-D/detector/trd/TRD_Garfield_second_cathode.png Garfield simulations], [http://www.jlab.org/Hall-D/detector/trd/TRD_Garfield_second_cathode_track.png track example]
 
#** Adding additional cathode separates the drift and amplification volume and allows to set independently drift velocity and gas gain [http://www.jlab.org/Hall-D/detector/trd/TRD_Garfield_second_cathode.png Garfield simulations], [http://www.jlab.org/Hall-D/detector/trd/TRD_Garfield_second_cathode_track.png track example]
# Preliminary design: [http://www.jlab.org/Hall-D/detector/trd/Drawing1_Layout1.pdf 3D schematic]
+
# Design ideas: [http://www.jlab.org/Hall-D/detector/trd/Drawing1_Layout1.pdf 3D schematic]
  
 
<!--
 
<!--

Revision as of 11:31, 23 June 2016

June 23, 2016 Transition Radiation Detector meeting

Recent TRD reports at the GlueX collaboration meeting

  1. Oct 2015
  2. Feb 2016
  3. May 2016

Prototype: requirements and very preliminary design

  1. Requirements:
    • Use existing FDC pre-amps, fADC125, connectors, cables
    • Wires and strips at 90 deg.;
    • One 24-channel pre-amp for the wires and one pre-amp for the strips.
    • Active area sizes:
      • 240 mm across wire direction: sense wire pitch of 10 mm
      • 120 mm across strip direction: strip pitch of 5 mm.
    • Field wires in between sense wires with 10 mm pitch.
    • 20 mm drift gap
    • Max drift time < 3 microseconds (to be used within the standard GlueX DAQ):
  2. Design ideas: 3D schematic