Difference between revisions of "Minutes-4-1-2010"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 7: | Line 7: | ||
# Electronics | # Electronics | ||
− | #* finalizing PCB design (Fernando, Kim) | + | #* finalizing PCB design (Fernando, Kim) [[Media:Board_Improvements.docx|Board Improvements]] |
#* follow up on the threshold investigations (Fernando) | #* follow up on the threshold investigations (Fernando) | ||
# Cathode frame | # Cathode frame |
Revision as of 08:05, 1 April 2010
April 1, 2010 FDC meeting
Tentative Agenda
- Electronics
- finalizing PCB design (Fernando, Kim) Board Improvements
- follow up on the threshold investigations (Fernando)
- Cathode frame
- cathode redesign (Bill, Roger)
- Wire winding update
- info about the Monday meeting discussing the IUCF phase 3 contract (Beni)
- possibilities for wire stringing at JLab (Lubomir)
- Full scale prototype tests (Beni)
- wire/cathode cleaning and HV test results
- future plans
- Other
- off-site production space update