Difference between revisions of "Minutes-4-1-2010"

From GlueXWiki
Jump to: navigation, search
 
(Tentative Agenda)
Line 7: Line 7:
  
 
# Electronics
 
# Electronics
#* finalizing PCB design (Fernando, Kim)
+
#* finalizing PCB design (Fernando, Kim) [[Media:Board_Improvements.docx|Board Improvements]]
 
#* follow up on the threshold investigations (Fernando)
 
#* follow up on the threshold investigations (Fernando)
 
# Cathode frame
 
# Cathode frame

Revision as of 08:05, 1 April 2010


April 1, 2010 FDC meeting


Tentative Agenda

  1. Electronics
    • finalizing PCB design (Fernando, Kim) Board Improvements
    • follow up on the threshold investigations (Fernando)
  2. Cathode frame
    • cathode redesign (Bill, Roger)
  3. Wire winding update
    • info about the Monday meeting discussing the IUCF phase 3 contract (Beni)
    • possibilities for wire stringing at JLab (Lubomir)
  4. Full scale prototype tests (Beni)
    • wire/cathode cleaning and HV test results
    • future plans
  5. Other
    • off-site production space update