Difference between revisions of "Microscope Fabrication Readiness Review"

From GlueXWiki
Jump to: navigation, search
Line 14: Line 14:
  
  
== Documents on the CDC Construction ==
+
== Documents on the Microscope Construction ==
  
 
#  
 
#  
Line 30: Line 30:
 
** Personnel training
 
** Personnel training
 
** Schedule and Tracking
 
** Schedule and Tracking
* Coffee
 
 
* Video meeting with Jlab and CMU Financial people.
 
* Video meeting with Jlab and CMU Financial people.
 
** Billing and Reporting
 
** Billing and Reporting
* 17:00 Continue Document Review (if needed).
+
* Continue Document Review (if needed).
* 18:00 Closeout
+
* Closeout
* 18:30 Adjourn
+
* Adjourn
* 18:45 First Class Limo Departs from Frew Street to Airport
+
  
== Travel Itineraries ==
 
  
* Flights:
+
== Microscope Information ==
*# Date          From/To  Flight/Vendor      Depart/Arrive     
+
*# 10/21/2010    PHF-CLT  US 2545            07:00 AM/08:13 AM 
+
*# 10/21/2010    CLT-PIT  US 996              09:50 AM/11:16 AM 
+
*# 10/21/2010    PIT-PHL  US 96              08:45 PM/09:57 PM 
+
*# 10/21/2010    PHL-PHF  US 3578            10:55 PM/11:50 PM
+
 
+
== CDC Information ==
+
*[http://www.halld.org/CDC/index.html Photos of Construction and Setup]
+
*[[CDC|Central Drift Chamber]]
+

Revision as of 19:49, 17 January 2013

Date and Time

February 7, 2013

Video Connection information if needed

  • ESNET and EVO session
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Topics/Issues that need discussion/resolution

Documents on the Microscope Construction

Meeting Agenda

  • Project Overview
    • Scope of contract and current review
    • Status of construction
  • Tour of the Construction Facilities.
  • Technical Documents Review. Topics to be covered in going through the documents include the following.
    • Final Construction Plan
    • Quality Assurance Plans and Acceptance Test Plans
    • Testing procedures
    • Documentations and Travelers
    • Personnel training
    • Schedule and Tracking
  • Video meeting with Jlab and CMU Financial people.
    • Billing and Reporting
  • Continue Document Review (if needed).
  • Closeout
  • Adjourn