Difference between revisions of "May 1, 2015 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
Line 20: Line 20:
 
#* Collaboration Meeting
 
#* Collaboration Meeting
 
# Focusing optics and mirror status (John)
 
# Focusing optics and mirror status (John)
 +
# Simulation and reconstruction (John and Justin)
 +
# Shipping crate (Matt)
 
# Readout update (Justin)
 
# Readout update (Justin)
 
# [[DIRC Review Meeting | Planning for October review]] (All)
 
# [[DIRC Review Meeting | Planning for October review]] (All)
 
# AOB
 
# AOB
 +
 +
== Minutes ==
 +
 +
# Announcements
 +
#* John will be giving the DIRC update at the collaboration meeting, we should get slides to him next week on different components.
 +
# Focusing optics and mirror status (John)
 +
#* There was a meeting with the Bates engineers yesterday to update on the mirror progress
 +
#** There have been some issues observed with the initial grinding quality causing dispersion in one direction but not the other
 +
#** The hope is that the Nickel plating and grinding will help resolve some of this issue
 +
#** They are working on 3 small 10'' x 10'' (?) samples to test different parts of the procedure and determine
 +
#** The large flat mirror can only be done at a couple companies which can handle this size of mirror while the smaller samples can be done by several companies
 +
#** The hope is to have the samples completed by late May - early June to start testing the optical properties
 +
#* John will start next week on developing the procedure for testing reflectivity, etc. at Bates
 +
# Simulation and reconstruction (John and Justin)
 +
#*
 +
# Shipping crate (Matt)
 +
#*
 +
# Readout update (Justin)
 +
#*
 +
# [[DIRC Review Meeting | Planning for October review]] (All)
 +
#*
 +
# AOB
 +
#* Eugene reminded us that we should have a list of items we could purchase this fiscal year if funds were available, so we'll come up with a list of "off-the-shelf" items that could be bought now.

Revision as of 15:14, 1 May 2015

Meeting Information

GlueX PID Upgrade Meeting
Friday, May 1, 2015
1.30 pm, EDT
For those people at Jefferson Lab, the meeting will be in room F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements:
    • Collaboration Meeting
  2. Focusing optics and mirror status (John)
  3. Simulation and reconstruction (John and Justin)
  4. Shipping crate (Matt)
  5. Readout update (Justin)
  6. Planning for October review (All)
  7. AOB

Minutes

  1. Announcements
    • John will be giving the DIRC update at the collaboration meeting, we should get slides to him next week on different components.
  2. Focusing optics and mirror status (John)
    • There was a meeting with the Bates engineers yesterday to update on the mirror progress
      • There have been some issues observed with the initial grinding quality causing dispersion in one direction but not the other
      • The hope is that the Nickel plating and grinding will help resolve some of this issue
      • They are working on 3 small 10 x 10 (?) samples to test different parts of the procedure and determine
      • The large flat mirror can only be done at a couple companies which can handle this size of mirror while the smaller samples can be done by several companies
      • The hope is to have the samples completed by late May - early June to start testing the optical properties
    • John will start next week on developing the procedure for testing reflectivity, etc. at Bates
  3. Simulation and reconstruction (John and Justin)
  4. Shipping crate (Matt)
  5. Readout update (Justin)
  6. Planning for October review (All)
  7. AOB
    • Eugene reminded us that we should have a list of items we could purchase this fiscal year if funds were available, so we'll come up with a list of "off-the-shelf" items that could be bought now.