Difference between revisions of "May 07, 2024 KLONG CPS Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
(One intermediate revision by the same user not shown)
Line 13: Line 13:
 
*** Current Z locations  [[media:CPS Z locations.pdf]]
 
*** Current Z locations  [[media:CPS Z locations.pdf]]
 
*** possible moving plan https://www.aerogo.com/products/air-caster-rigging-system/
 
*** possible moving plan https://www.aerogo.com/products/air-caster-rigging-system/
 +
**** Concerms with dust/contamination - Tim to work with ES&H
 
* Baseline KLF schedule [[media:KLONG Baseline Schedule with MRI.pdf]]
 
* Baseline KLF schedule [[media:KLONG Baseline Schedule with MRI.pdf]]
 
* Power supply status - On order, due March 2025
 
* Power supply status - On order, due March 2025
 
* Magnet update (Josh/Stephanie)  
 
* Magnet update (Josh/Stephanie)  
 
** Can we use less expensive resin? What is the actual expected radiation levels at coils now?
 
** Can we use less expensive resin? What is the actual expected radiation levels at coils now?
 +
** Can we use tagger magnet LCW (goes upstairs - is radiation an issue?)
 
* Copper cooling update -  
 
* Copper cooling update -  
 
** Status of brazing sample test [[media:CPS Absorber cooling test sample.pdf]]
 
** Status of brazing sample test [[media:CPS Absorber cooling test sample.pdf]]

Revision as of 14:42, 6 May 2024

Meeting Time and Place

Tuesday, May 07, 2024, 1:00pm Hall D Counting House

  • Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard

Agenda

Minutes